Laserfiche WebLink
CC&V MINING <br /> IRON CLAD BUILDING,E.P.80W-90 TANK <br /> ACUREN FORMAL EXTERNAL INSPECTION 6-2011 <br /> Item Status Comments <br /> 1.0 Tank Containment <br /> 1.1 Containment structure in <br /> satisfacto Condition? u X Yes ❑ No* <br /> 1,2 Drainage pipestvalves fit for <br /> continued service ❑Yes ❑ No* X NIA TANK IS INSIDE OF BUILDING. <br /> 2.0 Tank Foundation and Sup s <br /> 2.1 Evidence of tank settlement <br /> or foundation washout? ❑Yes ❑X No* <br /> 2.2 Cracking or spalling of <br /> concrete pad or ring wall? ❑Yes u X No* N/A <br /> 2.3 Tank supports in satisfactory <br /> condition? ❑X Yes ❑No* NIA <br /> 2.4 Water able to drain away from <br /> tank? ❑ X Yes ❑ No* <br /> 2.5 Grounding strap secured and <br /> in ooDd condition? ❑Yes ❑ No* X N/A <br /> 3.0 Cathodic Protection <br /> 3.1 CID system functional? ❑Yes ❑ No* X N/A <br /> 3.2 Rectifier Reading: ❑Yes ❑ No* X N/A <br /> 4.0 Tank External Coatin <br /> 4.1 Evidence of paint failure? ❑ Yes ❑X No* <br /> 5.0 Tank ShelllHeads <br /> 5.1 Noticeable shell/head <br /> distortions, buckling,denting or ❑ Yes ❑X No* <br /> 5.2 Evidence of shell/head <br /> corrosion or cracking? ❑Yes ❑ X No* <br /> 6.0 Tank Manwa s Pi in 0and Equipment within Secondary Containment <br /> Flanged connection bolts tig t LEAKS ARE PRESENT ON THE FILTER AND PUMP. <br /> and fully engaged with no sign of <br /> wear or corTosion? ❑ Yes ❑X No* <br /> 7.0 Tank Roof <br /> 7.1 Standing water on roof? ❑ Yes ❑X No* <br /> 7.2 Evidence of Coating cracking, <br /> crazing, ell blistering? ❑ Yes ❑X No* <br /> 7.3 Holes in roof? ❑Yes ❑ X No* <br />