Laserfiche WebLink
CCBV MINING <br /> FUEL FARM DIESEUKEROSINE TANK <br /> ACUREN FORMAL EXTERNAL INSPECTION 6-2011 <br /> Item Status Comments <br /> 1.0 Tank Containment <br /> 1.1 Containment structure in <br /> satisfacto condition? ❑ X Yes ❑ No* <br /> 1.2 Drainage pipestvalves fit for <br /> continued service ❑Yes ❑ No* X NIA <br /> 2.0 Tank Foundation and Sup s <br /> 2.1 Evidence of tank settlement <br /> or foundation washout? ❑Yes ❑X No* <br /> 2.2 Cracking or spalling of <br /> concrete pad or ring wall? ❑Yes ❑ No* X NIA <br /> 2.3 Tank supports in satisfactory <br /> condition? ❑Yes ❑ No* X N/A TANK SITS ON GROUND. <br /> 2.4 Water able to drain away from <br /> tank? ❑ X Yes ❑ No* <br /> 2.5 Grounding strap secured and <br /> in 000d condition? ❑Yes ❑ No* X WA <br /> 3.0 Cathodic Protection <br /> 3.1 CP system functional? ❑Yes ❑ No* X NIA <br /> 32 Rectifier Reading: ❑Yes ❑ No* X WA <br /> 4.0 Tank External Coating <br /> 4.1 Evidence of paint failure? Li Yes ❑ No <br /> MILD PAINT DAMAGE EXISTS. <br /> 5.0 Tank Shell/Heads <br /> 5.1 Noticeable shellthead <br /> distortions, buckling,denting or ❑Yes ❑ X No* <br /> 5.2 Evidence of shellrhead <br /> corrosion or cracking? uYes ❑ X No* <br /> 6.0 Tank Manwa s Piginp and Equipment within Secondary Containment <br /> Flanged connection bolts tight SPILLS EXIST ON GROUND BY FILLING STATION. NO SPILL KIT IS IN VACINITY. <br /> and fully engaged with no sign of <br /> wear or corrosion? ❑Yes ❑ X No* <br /> 7.0 Tank Roof <br /> 7.1 Standing water on roof? ❑ Yes ❑X No* <br /> 72 Evidence of coating cracking, <br /> crazing, ell blistering? ❑ X Yes ❑ Na* MILD PAINT DAMAGE EXISTS. <br /> 7.3 Holes in roof? ❑Yes ❑ X No* <br />