Laserfiche WebLink
ResponseSpill <br /> NEWMONT <br /> .. <br /> ility& External Relations <br /> 40 CFR(1) Requirement* Location in <br /> Plan <br /> (you may not use flapper-type valves). <br /> 112.8(b)(3) For undiked areas with a potential for discharge, design the drainage systems to <br /> flow into a pond, lagoon,etc.,designed to retain the oil or return it to the Facility; Section 4.1.2 <br /> and locate catchment basins outside of areas subject to periodic flooding. <br /> 112.8(b)(4) For a Facility not engineered as in (b)(3)above, equip the final discharge of all <br /> ditches inside the Facility with a diversion system that would, in the event of an Section 4.1.2 <br /> uncontrolled discharge, retain the oil in the Facility. <br /> 112.8(b)(5) Where drainage waters are treated in more than one treatment unit and such <br /> treatment is continuous, and pump transfer is needed, provide two "lift" pumps, <br /> with at least one permanently installed. Design the Facility drainage systems to Section 4.1.9 <br /> prevent a discharge in case there is an equipment failure or human error at the <br /> Facility. <br /> 112.8(c)(1) Only use a container where the material and method of construction are compatible <br /> with the stored material and the conditions of storage,such as temperature and 4.1.1 <br /> pressure. <br /> 112.8(c)(2) Provide all container installations with secondary containment for the entire <br /> installation,the containment to have a capacity of the largest single container, and <br /> 4.1.2 <br /> sufficient freeboard to contain precipitation;and ensure that diked areas(walls and <br /> floors)are sufficiently impervious to contain discharged oil. <br /> 112.8(c)(3) Prevent the discharge of uncontaminated precipitation from diked container areas <br /> directly to the storm sewer,etc., (i.e., bypassing any treatment system)unless: <br /> (i) the bypass valve to the treatment system is sealed closed; Section 4.1.3 <br /> (ii) the rainwater drainage is inspected to avoid a discharge of oil; Section 4.1.3 <br /> (iii) the bypass valve to the treatment system is opened and resealed under <br /> Section 4.1.3 <br /> responsible supervision;and <br /> (iv) records are maintained of such events. Appendix F <br /> 112.8(c)(4) Protect any completely buried metallic storage tanks installed after January 10, <br /> 1974, by coating or cathodic protection;and regularly leak test those tanks. Section 4.1.5 <br /> 112.8(c)(5) Protect the buried portion of any partially buried metallic storage tanks by coating <br /> or cathodic protection,or do not use the tanks. Section 4.1.5 <br /> 112.8(c)(6) Test aboveground containers at some suitable frequency for integrity using visual <br /> inspections and another system of non-destructive testing.Also: <br /> inspect the supports and foundations of the containers; <br /> keep records of the comparisons of the tests/inspections;and Section 4.1.6 <br /> frequently inspect the outside of all containers visually for deterioration, <br /> discharges,or accumulation of oil inside their dikes. <br /> 112.8(c)(7) Control leakage of internal heating coils by monitoring the steam return or exhaust <br /> lines for oil,or pass the lines through a separation or retention system. Section 4.1.7 <br /> 112.8(c)(8) Engineer or update each container installation in accordance with good engineering <br /> practice to avoid discharges, providing at least one of the following: <br /> (i) high liquid level alarms with an audible or visual signal; <br /> (ii) automatic high liquid level pump cut-off devices; <br /> Section 4.1 <br /> (iii) a direct signal between the container gauge and pumping station;or <br /> (iv) a fast response system to detect oil level of each storage container with a <br /> person present to monitor gauges.Also: <br /> (v) regularly test liquid level sensing devices. <br /> 112.8(c)(9) Observe the effluent treatment plant frequently enough to detect upsets that could Section 4.1.9 <br /> - - - ------ --------- - --- -------- -- - ----- - ------- .. _._ _.. - -- -- ----- -------- --- <br /> Department THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT Doc Id:NA-CCV-SER-PLAN- <br /> 1930 <br />