Laserfiche WebLink
STORMWATER MANAGEMENT PLAN <br /> CRIPPLE •- GOLD MINING COMPANY <br /> 5.0 Comprehensive Inspection <br /> The SWMP Administrator and the members of the stormwater management team who are responsible for <br /> maintenance of stormwater structures will perform periodic visual site inspections—both preventative <br /> maintenance inspections and comprehensive inspections Information will be verbally transmitted to those <br /> who have the authority to implement the recommendations that may be generated. Comprehensive <br /> inspections will be completed at least twice each year, in spring and fall, and preventative maintenance <br /> inspections will be completed at least quarterly. Results of the inspections will be summarized in the annual <br /> reports submitted to the WQCD, pursuant to Stormwater Permit No. COR-040000 as certified (COR- <br /> 040049) for the Cresson Project. <br /> Part 1.B.4.c of COR-0400000 requires a preventative maintenance program as part of the SWMP that <br /> includes inspecting and testing of equipment and systems to prevent conditions that could cause <br /> breakdown or failures resulting in discharges of pollutants to surface waters. Part 1.B.5.a of COR-040000 <br /> requires comprehensive inspections in addition to the preventative maintenance inspections. CC&V will <br /> inspect all stormwater features quarterly with preventative maintenance or repair requirements being <br /> assessed during the inspection. Details of the preventative maintenance testing and inspection protocols <br /> can be found in the Preventative Maintenance Section 4.4.1 of this SWMP described above. <br /> The attached Figures correspond to an inspection form that can be found in Attachment 2. Each inspection <br /> form lists the BMPs and/or EMPs that can be found on the corresponding Figure. The inspection forms also <br /> require a general assessment of the condition of the site-wide stormwater system <br />