My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (55)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (55)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 2:02:33 AM
Creation date
12/16/2019 2:38:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 3
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER MANAGEMENT PLAN <br /> CRIPPLENEWMONT <br /> D VICTOR GOLD MINING COMPANY <br /> 4.5 Identification of Discharges Other than Stormwater <br /> The stormwater conveyance system on the site will be evaluated periodically for the presence of flows other <br /> than stormwater. A description of the results of any evaluation for the presence of flows other than <br /> stormwater, the method used, the date of any evaluations and the on-site locations that were directly <br /> observed during the evaluation will be included, as appropriate, in the inspection record. <br /> This evaluation is also accomplished through careful consideration of the use and disposition of materials <br /> and chemicals on the site, the design and operation of the VLFs as zero-discharge facilities, the lack of <br /> need to dewater the mine, and management of domestic effluents in biological/septic systems. All new <br /> construction is examined for potential non-stormwater discharges and for the use of appropriate BMPs. <br /> Periodic inspections serving as the basis for annual reports examine the site for non-stormwater flows at <br /> least four times (quarterly) per year. If any non-stormwater flows are found, their presence and their nature <br /> will be described in this plan or identified in the inspection record. <br />
The URL can be used to link to this page
Your browser does not support the video tag.