My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-13_REVISION - M1980244 (59)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-12-13_REVISION - M1980244 (59)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:41:31 PM
Creation date
12/16/2019 1:11:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/13/2019
Doc Name Note
Appendix 1 - 2
Doc Name
Request For Amendment To Permit
From
CC&V
To
DRMS
Type & Sequence
AM13
Email Name
TC1
MAC
BFB
ERR
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Goldcorp-Cripple Creek&Victor Gold Mine <br /> Technical Specification No 02777 GEOTEXTILE ■ <br /> VLF2 Phase 3 <br /> Project No.475.0106.033 <br /> December 5,2019 <br /> 5. CONTRACTOR shall preserve integrity and readability of the geotextile roll <br /> labels, and store such that MANAGER and CERTIFYING ENGINEER have access to <br /> the package slips or roll labels for each roll to verify roll acceptance. <br /> 2. PART 2: PRODUCTS <br /> 2.1. Materials <br /> A. Twelve-ounce Non-Woven Needle Punched Geotextile: <br /> 1. Geotextile shall be comprised of polyester or polypropylene fibers. Rolls shall be <br /> free of holes, contamination, and foreign matter. <br /> 2. The geotextile supplied for the project shall meet or exceed the minimum (unless <br /> noted otherwise) roll values shown in the table below: <br /> MINIMUM AVERAGE ROLL VALUES FOR <br /> GEOTEXTILE MATERIAL <br /> Property ASTM Test Method Value <br /> Weight(oz./sq.yd.) D5261 11.9 <br /> Puncture(Ibs.) D6241 800 <br /> Apparent Opening Size D4751 No.80 to 140 Sieve <br /> 3. PART 3: EXECUTION <br /> 3.1. Installation <br /> A. Geotextile Deployment <br /> CONTRACTOR shall handle geotextile in a manner to ensure that geotextile is not <br /> damaged, and shall comply with the following: <br /> 1. No equipment or tools shall damage the geotextile by handling, trafficking, or <br /> other means. <br /> 2. No personnel working on the geotextile shall smoke, wear damaging shoes, or <br /> engage in other activities that could damage the geotextile. <br /> 3. Cross seams between two (2) panels of geotextile shall be staggered by a <br /> minimum distance of five (5) feet on slopes greater than ten percent (10%). <br /> 4. In the presence of wind, all geotextiles shall be weighted with sandbags or the <br /> equivalent. Such sandbags shall be installed during deployment and shall remain <br /> until replaced with cover material. <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.