Laserfiche WebLink
Project Pikewew Quarry <br /> Date Dec-2019 <br /> WORKSHEET NO.15C <br /> PRODUCTIVITY AND COSTS FOR BLASTING ACTIVITIES <br /> Earthmoving Activity <br /> 1 Drill&Blast total <br /> Calculation: <br /> Total Blasting = 1 40 " 246,299 bcy = $ 344,819 <br /> Cost volumetric volume to be blasted <br /> blasting cost <br /> ($/ton) <br />