Laserfiche WebLink
Project: Pikeview Quarry <br /> Date: Dec-2019 <br /> WORKSHEET NO. 14A <br /> REVEGETATION COSTS <br /> Name and Description of Areas to be Revegetated: <br /> 7 Revegetation <br /> Description of Revegetation Activities <br /> Costs For = 121 ac ( 2.1 $/ac. + 2000 $/ac. ) _ $ 241,750 <br /> Seeding and Acreage to be cost for cost for seeding, <br /> tree reseeded seedbed fertilizing, mulching, <br /> preparation and irrigation <br /> Costs For = 57,000 cy ( 2.1 $/ac. + 0 $/ac. ) _ $ 117,990 <br /> topsoil Quantity of Cost per CY of <br /> Preparation Topsoil to'be topsoil to be <br /> prepared prepared <br /> 20% Contingency for vegetation failure: <br /> Costs For = 24 ac ( 2.1 $/ac. + 2000 $/ac. ) _ $ 48,350 <br /> Reseeding Acreage to be cost for cost for seeding, <br /> reseeded seedbed fertilizing, mulching, <br /> preparation and irrigation <br /> Other Revegetation Activity for this Area(e.g.Soil Sampling: <br /> TOTAL REVEGETATION COST = $ 408,090 <br /> Data Sources: <br /> Contractor planting costs from a coal mine <br /> Seedbed Preparation includes discing and ripping,drill seeding,topsoil and spoil sampling <br /> Irrigation costs are included with seeding,fertilizing and mulching costs <br />