Laserfiche WebLink
and identifying contour intervals,also ensuring the entire affected area is included (Please see Comment <br /> No. 6 above). <br /> Response: Exhibit F-1 has been resubmitted to address this comment. <br /> 15. Revegetation: Exhibit L,Worksheet No. 3 indicates 100 acres will require revegetation. Exhibit L, <br /> Worksheet No. 14A indicates 108 acres will require reseeding. <br /> a. Please explain the 8 acre discrepancy. <br /> b.These 100 or 108 acres need to be identified in Exhibit F, and should include topsoil and <br /> overburden stockpiles containing material to be used in the reclamation. <br /> Response: The revegetation areas in Exhibits F and L have been revised to 120.75 include the roads and <br /> stockpiles.The 8-acre discrepancy has been removed. <br /> 16. Exhibit F Final Land Use: Rule 6.4.6(b) requires showing the proposed final land use. Given the more <br /> complex revegetation plan, it will be helpful in understanding the final revegetation plan if types of <br /> vegetation in the disturbance area if these are shown. Please resubmit F-1 showing the different types <br /> of vegetation proposed. <br /> Response: Exhibit F-1 shows the vegetation communities proposed. <br /> 6.4.6 EXHIBIT G—Water Information <br /> 17. Drainage Features:Various drainage features are discussed in Exhibit G, most of which are not <br /> identified on any maps submitted in Exhibits C, F,or G. Please submit a map identifying and showing the <br /> location of the following: <br /> a. Informal detention basins(ref. 1st paragraph, p. G-3), <br /> b. Open drainage paths and drop structures (ref. 2nd paragraph, p. G-3), <br /> c. Final detention basin near east edge of the permit(ref. 3rd paragraph, p. G-3), <br /> d. Northeast rout to sediment pond (ref.4th paragraph, p. G-3), <br /> e.Small depressions (ref. 5th paragraph, p. G-3), <br /> f.Terrace channels and their flow directions(ref. 1st paragraph, p. G-4),and <br /> g.Any other channels,ditches and ponds referenced in the reclamation plan. <br /> Response: Exhibit C-1 has been revised to show the existing drainage features. Exhibit G-1 shows the <br /> proposed reclamation drainage features, but it has been revised to address this comment. <br /> Pikeview Quarry Amendment 4, Response to Adequacy <br /> December 11, 2019 <br />