Laserfiche WebLink
� 1 <br /> Reclamation Cost Worksheet Table of Contents <br /> Worksheet/Table Description <br /> Table L-1 Summary of Costs <br /> Worksheet No.2 Demolition Costs <br /> Worksheet No.3 Material Quantities <br /> Worksheet 5A Dozer Productivity Calculations For Dozer push Down Hill <br /> Worksheet 5B Dozer Productivity Calculations for Dozer Rip <br /> Worksheet No. 8A 345 Productivity Calculations for moving dirt from Borrow Area <br /> Worksheet No.8B 345 Productivity Calculations for Upgrading Road <br /> Worksheet No.9A Truck Productivity Calculations for moving dirt from Borrow Area <br /> Worksheet No. 12B Grader Productivity Calculations for upgrading road <br /> Worksheet No. 13A Dozer Cost Summary <br /> Worksheet No. 13B Earth Moving Costs Summary <br /> Worksheet No. 13C Trucking Costs Summary <br /> Worksheet No. 13D Motor Grader Costs Summary <br /> Worksheet No. 14A Revegetation Costs <br /> Worksheet No. 15C Productivity and Costs for Blasting Activities <br /> Worksheet No. 15E Other Reclamation Activity Costs <br /> Table 50-A-1 Revegetation Unit Costs <br /> Table 50-A-23 Equipment Ownership and Operating Costs <br /> Table 50-A-24 Equipment operator wage rates <br /> Table 50-A-26 Equipment Availability <br /> Table 50-A-24 Equipment operator wage rates <br /> Pikeview Quarry Amendment 4 <br /> 2019 <br /> L-4 <br />