My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-11_REVISION - M1977211
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2019-12-11_REVISION - M1977211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 7:51:47 AM
Creation date
12/12/2019 1:46:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
REVISION
Doc Date
12/11/2019
Doc Name
Adequacy Review Response
From
Castle Aggregate
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 1 <br /> Reclamation Cost Worksheet Table of Contents <br /> Worksheet/Table Description <br /> Table L-1 Summary of Costs <br /> Worksheet No.2 Demolition Costs <br /> Worksheet No.3 Material Quantities <br /> Worksheet 5A Dozer Productivity Calculations For Dozer push Down Hill <br /> Worksheet 5B Dozer Productivity Calculations for Dozer Rip <br /> Worksheet No. 8A 345 Productivity Calculations for moving dirt from Borrow Area <br /> Worksheet No.8B 345 Productivity Calculations for Upgrading Road <br /> Worksheet No.9A Truck Productivity Calculations for moving dirt from Borrow Area <br /> Worksheet No. 12B Grader Productivity Calculations for upgrading road <br /> Worksheet No. 13A Dozer Cost Summary <br /> Worksheet No. 13B Earth Moving Costs Summary <br /> Worksheet No. 13C Trucking Costs Summary <br /> Worksheet No. 13D Motor Grader Costs Summary <br /> Worksheet No. 14A Revegetation Costs <br /> Worksheet No. 15C Productivity and Costs for Blasting Activities <br /> Worksheet No. 15E Other Reclamation Activity Costs <br /> Table 50-A-1 Revegetation Unit Costs <br /> Table 50-A-23 Equipment Ownership and Operating Costs <br /> Table 50-A-24 Equipment operator wage rates <br /> Table 50-A-26 Equipment Availability <br /> Table 50-A-24 Equipment operator wage rates <br /> Pikeview Quarry Amendment 4 <br /> 2019 <br /> L-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.