Laserfiche WebLink
Any limestone, granite, or dolomite produced from the site may be processed and sold; however, <br /> there is expected to be very limited production of any products. <br /> (h) Incidental products <br /> No incidental products are expected to be produced; however, a demand for incidental products <br /> (surplus non-commodity) products will be determined as reclamation proceeds. Metal may be <br /> recycled and sold as scrap metal. <br /> (i) Explosives use and proof of surrounding stability <br /> Explosives will be required to reclaim Pikeview Quarry. There are no modifications to the <br /> explosives storage or the blasting plan. During reclamation activities, the explosives contractor <br /> may decide to modify the plan. The plan will be available to review in the quarry offices during <br /> active operations. The plan will ensure that off-site areas will not be adversely affected by blasting <br /> per Rule 6.5(4) of the Construction Materials Rules and Regulations. <br /> Pikeview Quarry Amendment 4 <br /> 2019 <br /> D-7 <br />