My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-06_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2019-12-06_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:28:03 PM
Creation date
12/6/2019 12:09:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/6/2019
Doc Name Note
Revised SL19
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Jared Ebert, Tom Medlin, Christine Belka
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adequacy Review <br /> Adequacy issues discussed during the inspection consisted of concerns about vegetative diversity <br /> on the hill crest of parcels ZA 12 and 13. DRMS noted that some weed mitigation opportunities <br /> are available to TMI through rule 4.15.7(5)(b) that could acceptably be employed to improve <br /> species diversity and encourage the native seeding in these areas. It was agreed that DRMS's <br /> review of vegetation transect data submitted with the bond release application would inform the <br /> interested parties of concerns and any decisions regarding adequacy. DRMS concluded that <br /> vegetation sampling occurred according to methods prescribed in the permit and that sample <br /> adequacy was achieved by methods described in rule 4.15.11(2)(a). <br /> III. APPROVAL CRITERIA FOR BOND RELEASE <br /> Phase I Bond Release <br /> Rule 3.03.1(2)(a) states: <br /> "Up to sixty percent of the applicable bond amount shall be released when the permittee <br /> successfully completes backfilling, regrading, and drainage control in accordance with the <br /> approved reclamation plan." <br /> Trapper Mine accomplishes backfilling of the mined pits primarily with draglines, using <br /> overburden and inter-burden material from a cut to backfill a previous, adjacent cut. Other <br /> equipment such as bulldozers, scrapers, backhoes, front-end loaders and trucks are also used to <br /> backfill areas. Once backfilled, bulldozers and/or graders grade the area to achieve approximate <br /> original contour. <br /> Regarding Phase I bond release, the approved reclamation plan for the Trapper Mine calls for <br /> backfilling and grading mine excavations and shaping the backfilled areas to the approximate <br /> configurations shown on the Postmining Topography Map,Map M12 in the permit. Graded areas <br /> are to blend into the surrounding adjacent areas. Every year TMI submits to the Division their <br /> Annual Reclamation Report(ARR)revising Appendix W of the permit. Each ARR includes a map <br /> showing actual post-mining topography from the previous year. Reclamation, comprised of back- <br /> filling and grading, topsoil placement and seeding for the requested Phase II SL 19 reclamation <br /> parcels, was conducted in 2009 -2013. <br /> Permit Number C 19 81010 <br /> SL19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.