My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-06_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2019-12-06_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:28:03 PM
Creation date
12/6/2019 12:09:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/6/2019
Doc Name Note
Revised SL19
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Jared Ebert, Tom Medlin, Christine Belka
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submittal of Bond Release Application and Completeness Determination by the Division <br /> TMI submitted the bond release application following the procedures described in the Act and <br /> Regulations. The application also utilized the Division's Guideline Regarding Selected Coal Mine <br /> Bond Release Issues, dated April 18, 1995. <br /> The Division received TMI's Phase II bond release application SL19 on 8 August 2017, and found <br /> the application complete on 21 July 2017, after the Division received proof of publication of the <br /> applicant's public notice. The completeness determination was made in accordance with Section <br /> 3.03.2(1)(d). Map 1, entitled SL19 Phase II Bond Release Area Delineation and submitted with <br /> the application, shows the location of each parcel. <br /> Bond Release Parcels <br /> SL 19 requests phase II bond release for the following nine parcels. <br /> Table 2. Summary of Bond Release Parcels and Associated Acres <br /> Parcel Acres Parcel Acres Parcels Acres <br /> AB 0 9 0.3 AB 12 10.1 AB 13 15.6 <br /> FA11 46.8 FA12 94.6 KA11 57.4 <br /> KA13 29.4 ZA12 46.5 ZA13 75.4 <br /> Public Notice <br /> TMI published notice of the bond release applications in the Craig Daily Press once weekly for <br /> four consecutive weeks beginning on July 21, 2017. TMI also notified landowners within and <br /> adjacent to the mine permit area, and other interested parties of the application for bond release, <br /> as required by section 3.03.2(1). The Division received no written comments, objections, or <br /> requests for an informal conference regarding the bond release application. <br /> Bond Release Inspection <br /> As the SL19 application was deemed complete as submitted and no adequacy questions were <br /> posed, the Division conducted a Phase II bond release inspection on 30 August 2017. The site <br /> inspection was conducted in accordance with Section 3.03.2(2). The Division notified the <br /> operator, surface owners, Bureau of Land Management (BLM), the Office of Surface Mining <br /> (OSM), and the Colorado State Land Board of the inspection via certified mail. Jerod Smith of <br /> the Colorado State Land Board was unable to attend. Attendees included: <br /> o Tom Medlin, Office of Surface Mining Reclamation and Enforcement(OSMRE) #562 <br /> o Robin Reilley, LISP; Colorado Division of Reclamation, Mining, and Safety(DRMS) <br /> o Dan Hernandez, Colorado Division of Reclamation, Mining, and Safety(DRMS) <br /> o Jennifer Maiolo, Bureau of Land Management (BLM) <br /> o Graham Roberts, Trapper Mining, Inc. (TMI) <br /> On 26 September 2017, DRMS provided the SL19 bond release inspection report to TMI, BLM, <br /> OSM and the Colorado State Land Board via electronic transmission. <br /> Permit Number C 1981010 <br /> SL19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.