Laserfiche WebLink
'AW <br /> V �IryY <br /> Figure 18. View of the sump at its elevated height of 6 feet following the termination of <br /> full-time pumping. Diesel laden surface water was captured within the berm while clean <br /> water was allowed to infiltrate through the lower levels of the berm. Photo captured <br /> October 30, 2019; view to the north. <br /> ia <br /> r f ; <br /> Figure 19. Berm rebuilding following emergency berm refortification the night before. <br /> Left image view to the south from beside Yule Creek; right image view to the north- <br /> northeast from the pump pad. Photos captured October 30, 2019. <br /> 27 <br />