My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-05_HYDROLOGY - M1999058 (4)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999058
>
2019-12-05_HYDROLOGY - M1999058 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 7:41:43 AM
Creation date
12/6/2019 7:46:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999058
IBM Index Class Name
Hydrology
Doc Date
12/5/2019
Doc Name
Oct. 11, 2019 Spill Report
From
Colorado Stone Quarries, Inc.
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H <br /> ij7 <br /> /mil' <br /> pp is <br /> Figure 8. View of excavation along the west side of the Franklin ridge to characterize <br /> spill depth and contamination. Photo captured October 17, 2019; view to the north- <br /> northwest. <br /> On Monday, October 21', Mr. Ben Miller and Ms. Katie Todt of GLA arrived on site to <br /> oversee the mitigation operation. Clean Harbors sent two representatives. Representatives <br /> from GLA, CSQ, and Clean Harbors discussed the previously developed mitigation plan. <br /> Additionally, on Monday, October 21 st, Mr. Dustin Czapla of the DRMS conducted a site <br /> visit in response to CSQ's spill report received by the Division on October 16, 2019. He <br /> also addressed a separate unrelated and subsequently resolved complaint which is detailed <br /> in his inspection report included as an attachment to this report in Appendix D. DRMS <br /> required CSQ to "respond to and correct the effects of the spill", and established a <br /> corrective action date of November 22, 2019. After conferral at the site, Mr. Czapla <br /> verbally agreed that the plan developed by Clean Harbors, CSQ, and GLA on Thursday, <br /> October 17, 2019 would meet Division standards. <br /> On Tuesday, October 22, 2019, CSQ operators and Clean Harbors prepared the sump area <br /> for pumping activities. This included building up a pad south of the sump to serve as the <br /> pump location and walking the pumps, hoses, and associated equipment down to the pump <br /> pad via heavy equipment. Extra water tanks, totaling 24,000 gallon capacity plus a 4,000 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.