My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-24_REVISION - P2007069
>
Day Forward
>
Revision
>
Prospect
>
P2007069
>
2019-10-24_REVISION - P2007069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 10:56:44 AM
Creation date
12/3/2019 11:27:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2007069
IBM Index Class Name
Revision
Doc Date
10/24/2019
Doc Name
Adequacy Review Response
From
COAG
To
DRMS
Type & Sequence
MD1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2013 Placed Concrete barriers on the Washington claim borders to delineate <br /> claim boundaries. Remodeled steel closures on shafts to provide better <br /> access to the underground workings. <br /> 2014 Underground survey and detailed engineers report. <br /> 2015 Detailed planning for underground access and Judgement in Clear Creek County <br /> in favor of COAG re our Option. <br /> 2016 Rehab of Freighters Friend Hoist <br /> 2017 Installation of new Electric Service at The Franklin Hoist House <br /> ( still waiting for XCell to hook up. <br /> 2018 Purchase of equipment and supplies for the underground re-Hab <br /> 2019 Purchase of Hoist for Franklin Shaft. Tree planting and Landscape <br /> + lots of other work, The end use of this property is Mining. Everything we are doing is <br /> to further that goal. The Definition of Mining is to remove a product for Sale. <br /> Until then it is Prospecting. This is a big project. <br /> The extensive legal work was un anticipated and not finished yet. This synopsis in <br /> no way is able to explain the work and expense we have done. <br /> The remaining work becomes apparent as we proceed. It will take time. <br /> To Re Timber the Franklin Shaft may take 3 Years depending on availability of <br /> Qualified Labor, Safety Concerns are Paramount. The project can easily take an <br /> additional 5 Years. <br /> Putting an artificial timeline on Prospecting Activities does not make sense. The bond <br /> is in place and the site is in Compliance. Keep in mind, the US went into Afghanistan <br /> and <br /> is still there 12 ? Years later and keeps extending their timeline. <br /> The Closures are in Place and are Extra Heavy, all that is required to make it permanent <br /> is a lock. It is Locked and Secure. <br /> Again No Groundwater has been observed nor is it anticipated. <br /> Thank You for the time and consideration. <br /> It should be noted that in my opinion, Contacts with Employees of the Division has <br /> been Helpful and I find the Permit Specialists and Inspectors Strait forward and <br /> Knowledgeable. This has been encouraging in this complex environment of Mining <br /> in the State of Colorado. <br /> Best Regards, <br /> John J Miner <br /> CEO. COAG Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.