D-4 <br /> closest of which will be receiving growth medium and the remaining four which will be in various <br /> stages of revegetation monitoring and maintenance; and the long-term (life-of-mine) plant area and <br /> associated facilities, some of which will be subject to advance reclamation; however, reclamation of <br /> the remainder of these facilities will be deferred to the end of life-of-mine. <br /> Dimensionally, a nominal overall pit width(i.e., active face)will typically be on the order of 2,500 ft. <br /> wide; and, the active pit floor area behind the mining face (necessary to accommodate loading and <br /> haulage of the ROM material)will typically extend to approximately 300 ft.at full mine-out of a given <br /> annual mining block. These dimensions will be subject to ongoing variances, however, based on <br /> mineable resource thickness, undulating topography, and other influencing factors (e.g., operational <br /> constraints,etc.),which may include the following: <br /> • Presence of rights-of-way or easements; <br /> • Presence of oil and gas wells or ancillary facilities; and, <br /> • Mining Block and/or Permit Area boundaries or other defined mining limits. <br /> (e) An approximate timetable to describe the mining operation. The timetable is for the purpose of <br /> establishing the relationship between mining and reclamation during the different phases of a <br /> mining operation. An Operator/Applicant shall not be required to meet specific dates for initiation, <br /> or completion, of mining in a phase as maybe identified in the timetable. This does not exempt an <br /> Operator/Applicant from complying with the performance standards of Section 3.1. If the operation <br /> is intended to be an intermittent operation as defined in Section 34-32.5-103(11)(b), C.R.S., the <br /> Applicant should include in this exhibit a statement that conforms to the provisions of Section 34- <br /> 32.5-103(11)(b), C.RS. Such timetable should include: (i) an estimate of the periods of time which <br /> will be required for the various stages or phases of the operation; (ii) a description of the size and <br /> location of each area to be worked during each phase; and, (iii) outlining the sequence in which <br /> each stage or phase of the operation will be carried out(Note: Timetables need not be separate and <br /> distinct from the mining plan,but may be incorporated therein); <br /> It is anticipated that site development activities will commence within 3 months of procurement of all <br /> necessary permits, approvals, and authorizations. Such development activities will include plant area <br /> site preparation, followed by plant facilities construction and concurrent pit"development" activities <br /> (i.e.,the simultaneous establishment of initial,pit-floor process waste stockpile location,thus providing <br /> an initial ROM stockpile)to ready the mining zone for full-scale,steady-state operations. <br /> Keenesburg No. 2 Mine_112 Reclamation Operation—November 22, 2019 <br />