D-17 <br /> • Targeted approximate annual production(sales)of 4 million tons per year <br /> • Mine to a nominal 30 ft. depth below ground surface(or to economic recovery limit)' <br /> • Minimal transport distance for process plant waste disposal(in-pit dry stack) <br /> Is Diversion of area-wide drainage/run-on away from active mining areas <br /> • Diversion of plant area precipitation run-off to the active pit depression(for infiltration) <br /> • Containment of footprint precipitation within active pit depression(for infiltration) <br /> • Concurrent reclamation(steady-state)with no provision for pit backfill(waste stockpile) <br /> • Provisions for temporary relocation and reconstruction of all existing internal roadways <br /> • Allotted 300-ft. setback from either side of Ennis Draw(600-ft.total width) <br /> • Pit sidewall slopes at 3H:1 V(natural angle of repose) <br /> • Allotted 50-ft. mining setback(crest line of excavation)from Permit Area boundaries, easements, <br /> rights-of-way,and all permanent man-made features(oil wells,pipelines, etc.)' <br /> Notes: 'Mining depth may vary with topographic undulations and/or thickness of economically-recoverable resource <br /> 'Ranch and/or oilfield service access will be maintained at all times and as per individual agreements with the <br /> respective stakeholders <br /> 'Prescribed minimum 50-ft.setback may be greater and vary as per agreements with the respective stakeholders <br /> Mine planning efforts to date have identified the following general pit progression on the basis of a nominal <br /> 5.2 million tons per year ROM production rate. <br /> Year 1 Mining Activity(NW Portion of Section 1) <br /> Initial mine development will require the nominal 1-ft. thick growth medium pre-stripped from: <br /> (1) the plant area(approximately 77,000 cubic yards); (2) the initial portion of the waste storage <br /> area (approximately 18,000 cubic yards); and, (3) the Year 1 mining boundary (approximately <br /> 183,000 cubic yards), respectively, to be temporarily stored in a collective growth medium <br /> stockpile (TS-0), at a location about 1,550 ft. to the immediate south-southeast of the plant area <br /> (but south of the Year 1 mine block). The TS-0 stockpile feature will have nominal footprint <br /> dimensions of about 520-ft.x 665-ft.,with an approximately 43-ft. overall height(total volume of <br /> approximately 278,000 cubic yards), as shown on Exhibit D-1: Mine Plan. <br /> Keenesburg No. 2 Mine_112 Reclamation Operation—November 22, 2019 <br />