Laserfiche WebLink
E. Other Disturbances (please describe) <br /> NA <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> NA <br /> G. New Roads: <br /> Length (ft): NA Width (ft): <br /> Significantly <br /> Upgraded Roads Length (ft): NA Width (ft): <br /> Are culverts or other crossings proposed? If so,please describe: <br /> NA <br /> H. Total project area to be disturbed (acres) NA <br /> 1. Describe the equipment to be used for the prospecting operations: <br /> As per above, physical prospecting will be completed with hand-held rock hammers, soils <br /> augers, and minimally, with PICK axe and shovel where necessary. Pickup TrucRs are <br /> used to access work areas on existing FS roads only. <br /> Form 2—Public File Page 7 of 14 <br />