Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches, waste piles, drill pads and collar areas of underground workings,ponds, etc. <br /> The proposed exploration effort is to consist of prospecting including hand sample <br /> collection (50 2-pd samples), mapping and soil sampling ( 500-800, 100 gram samples). <br /> Hand samples aFe te be GGI!eGted fFGFA eXigtiRg G6ItGFeps and FGGk dumps and, when <br /> necessary, are chipped from rock outcrops manually by hand-held rock hammer. Soil <br /> samples are to be collected by a hand-held han -opera a soil auger with a diameter <br /> 3-foot long stem_ Lls ial depth of sample collection is 1-foot with n max of 3-font. Where <br /> the conditions dictate, a pick axe or shovel is used to collect the sample in lieu of the <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity NA Width (ft) Length (ft) <br /> B. Drill Holes: <br /> Diameter <br /> Quantity NA Depth (ft) (in) <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity NA Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type, quantity and general dimensions: <br /> NA, but the Allard adit, which occurs on a Metallic Minerals controlled claim, will be <br /> chained and locked as part of on-going safety initiatives on the property. <br /> Form 2—Public File Page 6 of 14 <br />