My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-20_REVISION - M1977560
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977560
>
2019-11-20_REVISION - M1977560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:30:40 PM
Creation date
11/21/2019 2:36:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977560
IBM Index Class Name
Revision
Doc Date
11/20/2019
Doc Name
Decision Date Extension Request
From
Valco
To
DRMS
Type & Sequence
SI4
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRUCTION CONTRACT <br /> This AGREEMENT (hereinafter called "Contract" or"Agreement") is made and entered into <br /> this day November 131', 2019,by and between the Valco, Inc and Habitat Construction, LLC <br /> (hereinafter called "Habitat Construction" or "Contractor"). <br /> Witnessed: <br /> Valco,Inc and Habitat Construction agree as follows: <br /> I. Scope of Work.The Contractor shall provide service as proposed in the contractor's quote <br /> dated 11/1/2019. The work shall be completed as shown and specified in the Deere&Ault <br /> Construction Plans dated 6/13/2011 attached hereto. Contractor will provide labor and equipment <br /> to perform earthwork associated with filling in ponds C& D. <br /> The Work is generally described as the cut/fill of 205,000 CY of onsite material to fill in pond D <br /> and the cut/fill of 68,500 CY of onsite material to fill in pond C. Those anticipated volumes are <br /> anticipated to be adequate to fill in the ponds to an elevation 2 feet higher than the existing water <br /> level. The ponds will be dewatered prior to being filled. Dewatering will be completed using the <br /> Owners pumps and electrical utilities. Existing topsoil will be salvaged and spread on the cut and <br /> fill areas. Removed Trees and Brushed will be stockpiled onsite. <br /> 11.Completion Time. The Work to be completed under this Contract shall be commenced in the <br /> month of November 2019 and is anticipated to be completed by the month of March 2020. <br /> III. Contract Amount and Basis. Valco,Inc shall pay the Contractor the amount shown on the <br /> Contractor's bid dated November 1,2019 for the satisfactory performance of the Work, subject <br /> to additions and deductions and as described by the following: <br /> The unit prices set forth on the Contractor's revised bid dated November 1,2019 shall be <br /> the basis for the contract price. Payment at the unit prices will be based on actual measured <br /> quantities in the Work, except where the unit is a lump sum, in which case payment will be <br /> based upon the lump sum price as stated. <br /> IV. Payments. Valco, Inc shall make progress payments to the Contractor as follows: <br /> Monthly progress payment requests shall be remitted within thirty (30)days of issuance to <br /> the Valco, Inc. <br /> Anticipated Monthly Billing Schedule -Percentages to be agreed to on the 25`h of each <br /> month <br /> November- Invoice#1 =$65,236.38 (70%Mobilization, 70%Dewatering) <br /> December— Invoice#2=$222,521.34 (10%Mobilization, 10%Dewatering, 50%Pond D) <br /> January —Invoice #3 =$222,522.34 (10%Mobilization, 10% Dewatering, 50% Pond D) <br /> February—Invoice#4=$151,803.34 (10%Mobilization, 10% Dewatering, 100%Pond C) <br /> TOTAL CONTRACT AMOUNT=$662,073.40 <br /> Payments may be withheld on account of(1)defective Work not remedied, (2)failure of Contractor <br /> to make payments properly to Subcontractors or for labor, materials, or equipment, (3) <br /> unsatisfactory prosecution of the Work by the Contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.