My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-20_REVISION - M1977560
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977560
>
2019-11-20_REVISION - M1977560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:30:40 PM
Creation date
11/21/2019 2:36:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977560
IBM Index Class Name
Revision
Doc Date
11/20/2019
Doc Name
Decision Date Extension Request
From
Valco
To
DRMS
Type & Sequence
SI4
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VALCO, INC. <br /> 9121 Sunshine Meadow PI <br /> Parker,CO 80134 <br /> (719)469-0840 <br /> imem pw <br /> November 16, 2019 NOV 20 2019 <br /> DIVISION OF RECLAMATION <br /> Division of Reclamation, Mining and Safety MINING&SAFETY <br /> Attn: Ms. Amy Eschberger <br /> 1313 Sherman St., Room 215 <br /> Denver, CO 80203 <br /> Re: Rocky Ford East, Permit# M 1977-560, Approval of Technical Revision No. 3 (TR-3) <br /> Dear Ms. Eschberger: <br /> Valco, Inc has signed a contract with Habitat Construction, LLC (copy included) for the <br /> Mobilization, Dewatering, Topsoil and Cut and Fill of ponds C and D on our approved <br /> reclamation map. Projected time for completion is 54 working days. The contract should be <br /> complete by the end of February 2020. <br /> The contract should cover all but $187,394.91 of the current bond requirement. Please reference <br /> included spread sheet. The balance of the work for Ripping and Revegetation would be <br /> completed based on the best time frame to establish vegetation and would be covered by the <br /> current bonded amount of$193,678.00. Completion by the fall of 2020. <br /> Valco proposes that the requirement for additional bonding be extended until March 1, 2020 to <br /> allow for completion of the Habitat contract. At that time a review of the remaining reclamation <br /> cost could be made. <br /> Please contact me with any questions. <br /> Sincerely, <br /> Valco, Inc. <br /> -iot <br /> Tom Brubaker <br /> President <br />
The URL can be used to link to this page
Your browser does not support the video tag.