Laserfiche WebLink
VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br /> A. Required changes/modifications/special mitigation for plan of operations: <br /> B. Bond. Reclamation of all disturbances connected with this plan of operations is covered by Reclamation Performance Bond No. <br /> ,dated(mm/dd/yy) ,signed by_(Principal)and (Surety),for the penal sum of . This Reclamation Performance <br /> Bond is a guarantee of faithful performance with the terms and conditions listed below, and with the reclamation requirements <br /> agreed upon in the plan of operations. This Reclamation Performance Bond also extends to and includes any unauthorized <br /> activities conducted in connection with this operation. <br /> The bond amount for this Reclamation Performance Bond was based on a bond calculation worksheet. The bond amount may be <br /> adjusted during the term of this proposed plan of operations in response to changes in the operations or to changes in the economy. <br /> Both the Reclamation Performance Bond and the bond calculation worksheet are attached to and made part of this plan of <br /> operations.Acceptable bond securities(subject to change)include: <br /> 1. Negotiable Treasury bills and notes which are unconditionally guaranteed as to both principle and interest in an amount <br /> equal at their par value to the penal sum of the bond;or <br /> 2. Certified or cashier's check, bank draft, Post Office money order, cash,assigned certificate of deposit, assigned savings <br /> account, blanket bond, or an irrevocable letter of credit equal to the penal sum of the bond. <br /> (If more space is needed to fill out a block of information,use additional sheets and attach form) <br /> -11- <br />