Laserfiche WebLink
16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br /> cost the State of Colorado using an independent contractor to complete reclamation. The <br /> Office adds up to an additional maximum eighteen and one half(18.5%) percent of that <br /> total, which includes a private contract, typical overhead costs and profit. <br /> Direct Cost: <br /> i. Backfilling: 100 (cubic yards) X $0.187 (cost per yard) = Total $ 19 <br /> ii. Grading: .16 (cubic yards) X $ 13 (cost per yard) = Total $ 13 <br /> iii. Topsoil: (cubic yards) X $ (cost per yard) =Total $ <br /> iv. Seeding: 0.5 (acres) X $ 380 (cost per acre) = Total $ 190 <br /> v. Mobilization: 1 (Pieces of equipment) X $ 575.00 (cost per equipment) = <br /> Total $ <br /> Direct Cost Subtotal: $ <br /> Division's total overhead cost: X 18.5% <br /> Division's Total cost: $ 1995.00 <br /> Note: Based on the Division's experience the required financial warranty is normally set at <br /> approximately$2,500 per acre. Therefore, a typical 5 acre permit will have a total required financial <br /> warranty in the amount of$12,500. <br /> See bond estimate prepared by South Park Ranger District on following two pages. <br />