Laserfiche WebLink
the historically highest elevation, then no mitigation shall be required. If the <br /> reclamation condition water levels are shown to increase 2ft above the <br /> historically highest elevation, then a Technical Revision including specifications <br /> and design of an underdrain(s) will be submitted to the DRMS for approval prior <br /> to installation. <br /> Amen Aggregate Resource <br /> Specific Exhibits <br /> Page 50 of 84 <br />