Laserfiche WebLink
Compatibility calculations between the filter material and adjacent soils were <br /> made based on methods given in Seepage Drainage and Flow Nets, Cedergren <br /> 1977, pp 179-181 as follows: <br /> TH-11 TH-8 TH-1 <br /> 1. D15 of Coarser Material >= 5 0.75 = 2.78 0.75 = 5.36 0.75 = 4.69 <br /> D15 of Finer Material 0.27 0.14 0.16 <br /> 2. D15 of Coarser Material <= 5 2.20 = 0.11 2.20 = 0.20 2.20 = 0.35 <br /> Des of Finer Material 20.00 11.00 6.30 <br /> 3. D50 of Coarser Material <= 25 3.20 = 0.54 3.20 = 2.56 3.20 = 5.71 <br /> D5o of Finer Material 5.90 1.25 0.56 <br /> 4. D50 of Drain Material >= 1 2.80 = 1.00 <br /> Pipe Slot Size 2.80 <br /> Equation number 1. of the grain size compatibility calculations does come in <br /> slightly below the desired value of 5 for TH-11, however the average of the 3 <br /> samples is close to 4.3, so the filter should be expected to still perform well. <br /> The layout and construction specifications for the underdrain are given in Exhibit <br /> G Sheets 1-3. The underdrain has been placed horizontally up-gradient of the <br /> proposed clay liner. Vertically, the underdrain has been placed at the <br /> approximate elevations of groundwater at the time the boring s were made (April <br /> 2018). Groundwater elevations generally occur near the boundary of the <br /> overburden and gravel seam, which is as high the underdrain should be placed in <br /> order for it to have a good hydraulic connection to the gravel aquifer. The plan <br /> section of pipe with a minimum slope of .19% will flow 0.7 c.f.s. by gravity which <br /> is adequate to flow the Qaguifer value of 0.68 c.f.s. calculated above. <br /> Additional underdrains adjacent to the remaining mining cells may be also <br /> required depending on if groundwater mounding occurs. For the purpose of <br /> determining if significant mounding will occur adjacent to those cells, the <br /> applicant proposes the installation of groundwater observation wells along the <br /> upgradient property boundary as shown in Exhibit F - Reclamation Plan - <br /> Sheet 1. Wells OW-1 through OW-7 will be installed following completion of the <br /> project permitting process. Existing wells EW-1, EW-2 and EW-3 will also be <br /> utilized to observe groundwater elevations. <br /> The applicant proposes monthly observations of groundwater elevations <br /> (observations) for all wells for a minimum of 5 quarters prior to mining, during <br /> mining and for 2 years following reclamation of each mining cell. If the <br /> reclamation condition water levels are shown to occur at less than 2 feet above <br /> Amen Aggregate Resource <br /> Specific Exhibits <br /> Page 49 of 84 <br />