My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-30_INSPECTION - C1994082
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1994082
>
2019-10-30_INSPECTION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:43:10 PM
Creation date
10/31/2019 6:43:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Inspection
Doc Date
10/30/2019
Doc Name
Inspection Report
From
DRMS
To
OSM & BLM
Inspection Date
10/14/2019
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 14, 2019 C-1994-082/toast Mine RAR <br /> o Surge Tank ST 1 o Pond 13 <br /> o Pond 10 o Pond 14 <br /> These parcels are located as <br /> °k a <br /> I° <br /> ' - shown on the map at left. Both <br /> 1� N <br /> private and Federal surface areas <br /> ` <br /> # 1 are included in the proposed <br /> release. All parcels have <br /> ° previously b phase I and II <br /> p yeen <br /> v <br /> released and meet the 10 year <br /> - liability timeframe. Bulleted <br /> adequacy items below indicate <br /> sub j ects to be resolved before <br /> the proposal of a release decision. <br /> � o Wire enclosures were <br /> • ^,hie w` ;a w <br /> ° located during the inspection <br /> and should be removed <br /> tl� W <br /> k <br /> (photo 7). <br /> Approximately 181 acres within <br /> ,. the permit have achieved phase <br /> III and have been released. <br /> �A <br /> HYDROLOGIC BALANCE- <br /> _ Rule 4.05 <br /> Drainage Control4.05.1 4.05.2 <br /> 4.05.3; Siltation Structures <br /> 1 <br /> 4.05.5, 4.05.6; Discharge <br /> 93 <br /> Structures 4.05.7, 4.05.10; <br /> t, Diversions 4.05.4, Effluent <br /> Limits 4.05.2; Ground Water <br /> Monitoring 4.05.13; Surface <br /> Water Monitoring 4.05.13, <br /> 1 Drainage-Acid and Toxic <br /> 1 <br /> _. :.,e - - x �. Materials 4.05.8; Impoundments <br /> Ma Phase II arcels shown in ellow,phase II and III shown 4.05.6, 4.05.9; Stream Buffer <br /> p p y 'p Zones 4.05.18: <br /> in green and phase III requested parcels shown in orange. <br /> Unless otherwise noted pond banks, dams and reconstructed drainage ways appeared stable, <br /> functioning adequately and well vegetated at the time of inspection. <br /> o Pond 10,was not discharging water at the time of inspection. The outslope of the dam was stable <br /> with no seeps or evidence of leakage observed at the time of inspection. <br /> o The following drainages: <br /> YPM1, IPM3,YPM5,YPM6 and YPM7 were walked and appeared well armored and stable <br /> with well established vegetation on banks and grasses taking hold in the channel. No issues were <br /> noted at the time of inspection. <br /> One stock pond and three ponds were requested as noted above. Their release is contingent upon <br /> achieving phase II release in the associated parcels. All ponds and stock ponds received permanent <br /> designation from the Division of Water Resources in August 2008. The requested release areas report <br /> surface runoff to the following ponds: <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.