Laserfiche WebLink
NEWMONT <br /> GOLDCORP <br /> The 15-minute time limit was to demonstrate that the SLF was not exposed <br /> long enough to dry out. <br /> 12. Appendix 1.5. Welding rod QC certificates were provided. The DRMS could not find welding <br /> rod specifications in Appendix C. Please provide welding rod specifications for the purpose <br /> of determining whether the welding rods used met industry specifications. <br /> 02776.0 Geomembrane, Section 1.2.13.10 — All geosynthetic Quality Control <br /> Certificated required by these SPECIFICATIONS. Certification that extrudate to be <br /> used is composed of the same resin as the geomembrane to be used. <br /> 13. Appendix J.5.1: Fusion weld DF-897 has a peel strength test value of 1124 psi. Please <br /> confirm this is an accurate value. <br /> The strength test value reported was a typo, the correct peel strength value is 124 <br /> psi, and Appendix J.5.1 has been revised. <br /> 14. Appendix J.5.2. Please provide a description location for DX-191. <br /> Appendix J.5.2 been updated. <br /> Adequacy Review No. 2, dated October 24, 2019: <br /> 1. Appendix J.7. There appears to be some discrepancies with the defect repair <br /> documentation: <br /> a. The time for Defect Number 7304 repair is listed as 2:55 AM. Please confirm this <br /> overnight time frame or submit corrected documentation. <br /> b. The time for Defect Number 7553 repair is unintelligible. Please submit corrected <br /> documentation. <br /> The repair summary table has been updated. <br /> Should you require further information, please do not hesitate to contact Katie Blake via phone or <br /> email at 719.689.4048 and Katie.BlakeCaD-newmont.com, or me at 719.689.4042 and <br /> Justin.Raglin(o)newmont.com. <br /> Sincerely, <br /> Justin Ragl' <br /> Senior E ironmental Manager <br /> Cripple reek & Victor Mine <br /> JR/kb <br />