NEWMONT <br /> GOLDCORR <br /> a. The first bullet states, "The grading changes were minor and presented in the <br /> Record of Construction Drawings"? Please indicate which ROC drawings and <br /> describe how these minor grading changes are shown in these drawings. <br /> The minor grading changes where done in the field to best fit the actual field <br /> conditions. These changes didn't alter the intent of the design, which is to <br /> have solution drain towards the PSSA. As with previous submittals, these <br /> changes were not identified on any record of construction drawings. <br /> b. The second bullet indicates the use of extrusion welding was approved in addition <br /> to the IFC drawing requirement to use fusion welds to connect phased <br /> geomembrane panels. Who approved this change and what was the rationale for <br /> accepting this change? <br /> The certifying engineer approved extrusion welding the Phase 2 <br /> geomembrane liner to the Phase 1 geomembrane as this type of connection <br /> has been allowed to connect the phased panels throughout the VLF 2 <br /> construction. This has been allowed when field conditions are not optimal <br /> to complete a fusion weld due to space or curvature constraints. <br /> Additionally, extrusion welding is an acceptable liner connection method in <br /> the technical specifications outlined in Section 2.2 AA: <br /> "Approved field seaming processes are hot shoe double fusion <br /> welding and extrusion welding, when approved by CERTIFYING <br /> ENGINEER. Use double fusion welding as primary method of <br /> seaming adjacent geld panels." <br /> Tables: <br /> 3. Table 4 — Fill Temperature Monitoring Summary.Average fill temperature was recorded <br /> at 32°F on 4123119 at 7:00. Within 3.6 of the Earthworks Technical Specifications, "Frozen" <br /> is defined as a mean temperature of thirty-two degrees Fahrenheit(32`F) or less. Please <br /> address why SF and SLF placement occurred when rill material was frozen. <br /> Fill temperatures on the specified date showing 32°F was reported as whole numbers. <br /> Table 4, enclosed, has been revised with precise fill temperature. <br /> 4. Table 8 — CQA Earthworks Testing Summary — Drain Cover Fill: Sample Numbers <br /> NFDCF-7-R, NFDCF-8-R, and NFDCF-9-R have a Plastic Index greater than 5, therefore <br /> are not Non Plastic. Within 2.1 of the Earthworks Technical Specifications, the Plasticity <br /> Index for Drain Cover Fill is 0. The Record of Construction Report states, within Section <br /> 3.2.4 Drain Cover Fill, that a total of seven DCF samples were tested with passing results. <br /> Additionally, as noted in Table 8, Sample Numbers NFDCF-7-R, NFDCF-8-R, and <br /> NFDCF-9-R were approved by the Engineer of Record. Within Appendix H.4-Drain Cover <br /> Fill Laboratory Test Results, the lab results show these three samples had a Plastic Index <br />