Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> October 24,2019(Revision 1) <br /> The Engineer of Record accepted the use of DCF that did not meet the gradation and/or <br /> Plasticity Index criteria stated in the Technical Specifications. The minor deviations in <br /> material properties didn't impact the design intent of the DCF. <br /> S. ENGINEER'S OPINION <br /> Based on the construction activities observed, testing performed, and inspections completed, <br /> NewFields certifies that the project was constructed in general accordance with the approved IFC <br /> Drawings and Technical Specifications. <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\1-REPORTS\Cert Report-Phase 2A Part 2\DRMS Comments\475.0106.032 CCV PHASE 2A Part 2 <br /> ROC REPORT revl.doa <br /> Page 15 <br />