My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-25_REVISION - M1980244 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-10-25_REVISION - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 6:11:59 AM
Creation date
10/25/2019 12:46:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/25/2019
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR118
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company ■ <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> October 24,2019(Revision 1) <br /> 3.4.7. Geomembrane Defects and Repairs <br /> The CQA Monitor constantly inspected the geomembrane for defects from the time it was <br /> deployed until it was covered with DCF. A defect is defined as any item in which a repair <br /> is necessary to create a continuously sealed geomembrane layer. All defects were marked <br /> with a defect number by the CQA Monitor. Repairs were performed using the extrusion <br /> welding method and patches extended at least 6 inches beyond the defect in all <br /> directions. All repairs were assigned a repair number and cross checked with defect <br /> numbers to ensure that all defects were repaired. <br /> All repairs and extrusion welded seams were non-destructively tested using a vacuum <br /> box. The area being tested was covered in soapy water and the vacuum box was sealed <br /> to the geomembrane. A vacuum was pulled over the area for at least 10 seconds and if <br /> no bubbles were present, the test passed. If bubbles were present, the area failed and <br /> was marked as a defect.The repair process would then be repeated for the failing vacuum <br /> test. Vacuum tests overlapped each other by a minimum of 3 inches. The Geomembrane <br /> Defect/Repair Summary, including vacuum testing logs, is presented in Appendix J.7. <br /> 3.4.8. Geomembrane Acceptance <br /> Prior to DCF placement,the geomembrane was accepted by Tetra Tech,Tezak, CC&V, and <br /> the CQA Monitor. All CQA logs and survey data were thoroughly reviewed ensuring that <br /> all aspects of the geomembrane installation were performed in accordance with project <br /> Technical Specifications. Geomembrane Acceptance Forms are presented in Appendix J.8. <br /> 4. PROJECT DEVIATIONS <br /> Throughout construction, the following deviations from the Design and IFC Drawings were <br /> approved by the Engineer of Record: <br /> Several localized grading, underdrain alignment and HVSCS alignment changes were <br /> made throughout construction in order to better accommodate the actual site conditions. <br /> The grading changes were minor and are presented in the Record of Construction <br /> Drawings. <br /> IFC Drawings A60 and A62 indicated that a fusion weld should be used between the <br /> phased geomembrane connections; however, the use of extrusion welding was also <br /> approved. <br /> The Engineer of Record accepted the substitution of the CBR Puncture Value test (ASTM <br /> D6241) for the Puncture Value test (ASTM D4833) as reported/tested on the geotextile <br /> manufacturing certification sheets. <br /> P:\Projects\0106.032 VLF2 Phase 2 COA\J-REPORTS\Cert Report-Phase 2A Part 2\DRMS Comments\475.0106.032 CCV PHASE 2A Part 2 <br /> ROC REPORT revl.docx <br /> Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.