Laserfiche WebLink
Bureau of Land Management Environmental Assessment <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2018-0083 EA <br /> TABLE OF CONTENTS <br /> 1. Introduction 2 <br /> I.I. Identifying Information 2 <br /> 1.2. Introduction and Background 2 <br /> 1.3. BLM Purpose and Need 3 <br /> 1.4. Decision To Be Made 3 <br /> 1.5. Plan Conformance Review 3 <br /> 1.6. Public Involvement 4 <br /> 1.6.1. Scoping 4 <br /> 1.6.2. Public Comments 4 <br /> 1.7. Issues 4 <br /> 1.8. Issues Not Analyzed in Detail 4 <br /> 2. Proposed Action and Alternative 7 <br /> 2.1. Proposed Action 7 <br /> 2.1.1. Location Maps 8 <br /> 2.1.2.Applicant Project Design Features and BMPs: 11 <br /> 2.1.3. BLM Project Design Features: 11 <br /> 2.2. No Action Alternative 12 <br /> 2.3. Alternatives Considered but Not Analyzed in Detail 12 <br /> 3. Issue Analysis 13 <br /> 3.1. General Description of Project Area 13 <br /> 3.2. Past,Present and Reasonably Foreseeable Future Actions 13 <br /> 3.3. Issue 1 13 <br /> 4. Consultation and Coordination 15 <br /> 4.1. Individuals,Organizations,or Agencies Consulted 15 <br /> 4.2. List of Preparers and Participants 15 <br /> 5. References 17 <br /> 1 <br />