Laserfiche WebLink
Voluntary-43 CFR 3809 Plan of Operations Form <br /> Scope of Operation:Describe in detail the type and extent of the operation to be performed. Provide detailed <br /> information for any surface excavation or other land disturbance including roads,pits,trenches,waste piles,drill <br /> pads and collar areas of underground woridngs,ponds,etc.For placer type mining Include the amount of <br /> material to be processed and dimension from each work location,and the dimension of test sites.indicate the <br /> different types and locations of disturbance on the location map(s)in Exhibit Ill. <br /> 10. Use and Occupancy,ff applicable: <br /> The following information must be included in the proposed Plan of Operations In order to comply with the 43 <br /> CFR 3715,Use and Occupancy Under the Mining Laws,when use or occupancy exceeds 14-days in a 30-day <br /> period.The definitions of terms are found in 43 CFR 3715.0-5.These regulations apply to puhiic lands <br /> administered by the BLM.Please provide a written description of the proposed occupancy that describes in <br /> detail:(see 43 CFR 37153-2): <br /> a. How the proposed occupancy is reasonably Incident; <br /> b. Haw the proposed occupancy meets the conditions specified In 43 CFR 3715.2 and 43 CFR 3715.2-1 <br /> c. Where you will place temporary or permanent structures for occupancy; <br /> d. The location of and reason you need enclosures,fences,gates,and signs intended to exclude the <br /> general public; <br /> e. The location of reasonable public passage or access routes through or around the area to adjacent <br /> public lands;and <br /> f. The estimated period of use of the structures,enclosures,fences,gates and signs,as well as,the <br /> schedule for removal and reclamation when operations end. <br /> g. Indicate these items on the location maps)in Exhibit Ill. <br /> ( <br /> Page 14 of 36 <br />