My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-24_PERMIT FILE - M2019038
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019038
>
2019-10-24_PERMIT FILE - M2019038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 6:08:31 AM
Creation date
10/25/2019 12:17:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019038
IBM Index Class Name
PERMIT FILE
Doc Date
10/24/2019
Doc Name
Response to Filing Deficiencies
From
CBRG
To
DRMS
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Voluntary—43 CFR 3809 Plan of Operations Form <br /> 11. Hazmat-include information such as,but not limited to,type of generator,chemicals,fuel's,quantities,disposal, <br /> storage,etc If chemical processing plants are proposed In site operations,be sure to include tank capacities and <br /> operating solution volumes.Indicate locations of use and storage of hazardous materials on location map(s)In <br /> Exhibit 111. nn <br /> !�0 <br /> N <br /> l� o �'rr � a� � • <br /> 12. Rock Characterization and Handling Plans:Please include the following information and note N/A if something <br /> doesn't apply to the proposed operation.Depending on the proposal,these details may be minimal or very <br /> detailed. <br /> II. Materials Characterization Pla�np'ust encom s <br /> 1. Waste rock al�_ �1 � 3 .� -_ <br /> 2. Ore -- 13 5 4� Y n (��`', -�� pf o �,.e xa�J y% 4 C, <br /> 3. Tailings -- 5 4-;tQ< -, <br /> 4. Pit wall and floor rack _A)&,ep <br /> S. Pit backfill rock(dry/wet scenarios) Ma ��j 'f- J}!" 1 T�-+�-� Tfa`Ce <br /> 6. Cap/cover materials(identified site specific sources <br /> s ` 1 F <br /> Ill. Approach/Procedures for Characterization Qp-p, <br /> 1. Statistical Approach to Characterization(define statisd a equacy)to Include: <br /> a. Sample selection <br /> b. Number of samples <br /> c. Quantity of material <br /> d. Review by BI.M/CDRMS <br /> 2. Characterization Procedures <br /> a. Sample selection <br /> b. Identify by rock type/final disposition(ore,waste,pit wall,pit floor,backfill,etc) <br /> c. Record locations(both surface and at depth) <br /> d. Mineralogical analyses such as XRD,XRF,Petrology,Petrography,etc. <br /> e. Static testing—(required for ore,waste rock and tailings)such as Acid-Base Accounting,Net <br /> Acid/Alkaline Production,net carbonate value,etc. <br /> f. Kinetic testing(required for are,waste rock and tailings but not for metallurgical ore recovery) <br /> such as Humidity cell/column leach ^ ' <br /> IV. Cap/Cover Geotechnical Protocols(may include waste rack,spent leach,etc)to Include: <br /> 1. Grain Size <br /> 2. Atterburg limits <br /> 3. Initial moisture content <br /> 4. Dry bulk density <br /> Page 15 of 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.