Laserfiche WebLink
RECEI`TED <br /> 01, <br /> Bureau of Land Management " 21 <br /> Royal Gorge Field Office BYt.....:°:.`;... . <br /> Plan of Operations <br /> Request for Additional Information <br /> Operator: <br /> David Harvey <br /> PO Box 430 <br /> Hartsel,CO 80449 <br /> Date:09`04.2018 <br /> Time:3.04 pm <br /> BLIMI personnel <br /> to re rt con 'crsatio <br /> Amber Sanderson <br /> Correspondence: <br /> Exhibit lV:Mining Plan <br /> 4. General Schedule of Operations <br /> • Site Development:occur intermittently as prospecting locatioas are explored.New <br /> excavation pits will be dug by the operator for customcWpublic to prospect. <br /> Development will occur along the eastern and south edges of the 033 acres. <br /> Development will not occur any further to the north. <br /> 5. Access <br /> • Access onto the site is from a pre-existing BLNVState road(see pic labeled"Looking <br /> Northeast"in Plan of Operations).'The Coloro Rd(County Road)turns into the <br /> BLM/Statc road. <br /> 13. Rock Characterization and Handling Plans: <br /> II. Materials Characterization Plan must encompass: <br /> 5. No trenches rather excavated pits(6x4)that will be sloped 3:1-4:1 during active and <br /> intermittent operations <br /> Vl. Waste Rock Management Plan <br /> 7. Overburden will be used as backfill for excavated pits.Overburden will be stored 10 <br /> feet from the pits edge.Overburden and topsoil could be used as berm material for <br /> stotznwatcr control. <br /> 14. Spill Contingency Plan <br /> • Any spills that should occur will be the result of a hose or hydraulic line leak from the <br /> mining equipment(e.g.trackhoe or skid loader).Spills could occur during transportation. <br /> 5 gallon gas tanks will not be stored on-site and kept in the operator's pick-up. <br /> 16. Interim Management Plan <br />