Laserfiche WebLink
061 Excavate for Lower Hubbard Creek Riprap EXCAVATE 1 9.18 $1,446 <br /> Placement <br /> 063 Excavate for Bear Creek Riprap Placement EXCAVATE 1 1.36 $214 <br /> 065 Excavate for Elk Creek Riprap Placement EXCAVATE 1 200.00 $31,474 <br /> 066 Remove Upper Hubbard Creek Sediment Pond DOZER 1 2.99 $947 <br /> 067 Regrade East Bench Pond DOZER 1 0.61 $192 <br /> 068 ExcavateBackfill Pond C Wall Area EXCAVATE 1 1.67 $263 <br /> 069 Regrade West Valley Fill Diversion EXCAVATE 1 1.81 $286 <br /> 070 Remove Sanborn Creek Ditches(CD-1,2,3,4,5 DOZER 1 1.46 $462 <br /> and CD-A) <br /> 071 Remove Sewage Leach Field DOZER 1 0.61 $192 <br /> 072 Regrade Pond A DOZER 1 0.61 $192 <br /> 073 Regrade Pond B DOZER 1 26.02 $8,252 <br /> 074 Regrade Pond D DOZER 1 42.69 $13,542 <br /> 075 Regrade Pond E DOZER 1 4.39 $1,391 <br /> 076 Remove Gravel from Substation No. 3 to Sediment DOZER 3 0.37 $348 <br /> Pond <br /> 077 Regrade Pond F DOZER 1 2.26 $716 <br /> 078 Regrade Ditches at Hubbard Creek Fan Site DOZER 1 0.81 $255 <br /> 090 Replace Topsoil from Stockpile to Previously SCRAPERI 1 1.86 $1,473 <br /> Disturbed Elk A <br /> 091 Replace Topsoil from Stockpile to Sanborn Creek SCRAPERI 1 12.82 $10,137 <br /> Areas <br /> 092 Replace Topsoil from Stockpile to East Refuse SCRAPERI 1 5.07 $4,009 <br /> Area <br /> 093 Replace Topsoil from Stockpile to West Valley Fill SCRAPERI 1 27.58 $21,806 <br /> Area <br /> 094 Replace Topsoil from Stockpile to II-West Refuse SCRAPERI 1 5.80 $4,582 <br /> Pile <br /> 095 Replace Topsoil from Stockpile to II West Refuse SCRAPERI 1 1.09 $862 <br /> Pile Road <br /> 096 Replace Topsoil from Stockpile to Expanded Elk DOZER 3 0.13 $128 <br /> Creek Mine Fa <br /> 097 Replace Topsoil from Stockpile to Substation No. DOZER 3 1.14 $1,089 <br /> 3 <br /> 098 Replace Topsoil from Stockpile to Elk Creek Mine SCRAPERI 1 18.89 $14,936 <br /> Area <br /> 099 Replace Topsoil from Stockpile to CBM-15 Drill DOZER 3 0.25 $234 <br /> Pad <br /> 100 Replace Topsoil from Stockpile to Drill Pads from DOZER 3 39.00 $37,113 <br /> MR's and T <br /> 101 Replace Topsoil from Stockpile to Light Use Road DOZER 3 0.28 $268 <br /> to CBM-15 <br /> 102 Replace Topsoil from Stockpile to Light-Use DOZER 3 36.58 $34,807 <br /> Roads from MR's <br /> 103 Replace Topsoil from Stockpile to Pond F,Ditches DOZER 1 2.86 $906 <br /> and Plunge <br /> 110 Seal and Backfill All Mine and Vent Shaft Entries MINESEAL 1 400.00 $83,545 <br /> III Plug and Seal All Boreholes and GVB's BOREHOLE 1 1,098.00 $317,648 <br /> 120 Broadcast Seed Mine Site REVEGE 1 216.50 $208,006 <br /> 121 Broadcast Seed Drill Pads Associated with MR's REVEGE 1 86.46 $62,426 <br /> and TR's <br /> 122 Broadcast Seed Light-Use Roads from MR's and REVEGE 1 63.18 $48,058 <br /> TR's <br /> 130 Demolish and Remove All Mine Facilities DEMOLISH 1 800.00 $1,019,582 <br /> 140 Mobilize/Demobilize Equipment for Initial MOBILIZE 1 10.00 $23,063 <br /> Reclamation <br />