Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Sitewide update for SLI Phase I and RN7 <br /> Site: Elk Creek Mine Permit Action: SL1 Permit/Job#: C1981022 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 9/9/2019 County: Delta Filename: CO22-000 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Backfill and Regrade Elk Creek Facilities Area DOZER 3 194.68 $185,254 <br /> 002 Backfill and Regrade Sanborn Creek Facilities DOZER 3 9.01 $8,570 <br /> Area <br /> 003 Backfill and Regrade Substation No. 3 Pad and DOZER 3 1.33 $1,270 <br /> Sediment Pond <br /> 004 Backfill and Grade Material Used to Widen Access DOZER 3 1.53 $1,459 <br /> Road <br /> 005 Backfill and Regrade Elk Creek Mine Area DOZER 3 101.64 $96,722 <br /> 006 Move Fill Material from Elk Creek Mine to Elk SCRAPERI 1 45.33 $35,833 <br /> Creek Faciliti <br /> 007 Backfill and Regrade CBM-15 Drill Pad DOZER 3 0.53 $506 <br /> 008 Backfill and Regrade Primary Riprap Borrow Area DOZER 3 4.75 $4,525 <br /> 009 Backfill and Regrade Secondary Riprap Borrow DOZER 3 12.05 $11,462 <br /> Area <br /> 010 Backfill and Regrade Elk Creek Mine Rock Safety DOZER 3 23.52 $22,385 <br /> Catch Bench <br /> Oil Backfill and Regrade Temporary Conveyor DOZER 3 11.87 $11,297 <br /> Corridor <br /> 012 Regrade Expanded Elk Creek Mine Fan Bench DOZER 3 1.06 $1,005 <br /> 013 Regrade Drill Pads Associated with MR's and TR's DOZER 3 105.07 $99,986 <br /> 014 Regrade Drill Pads and Roads,MR106 DOZER 1 86.03 $24,478 <br /> 015 Replace Topsoil to Drill Pads and Roads DOZER 1 51.85 $14,752 <br /> 016 Broadcast Seed Drill Pads and Roads REVEGE 1 41.44 $27,979 <br /> 020 Regrade West Valley Fill DOZER 3 2.02 $1,921 <br /> 021 Haul Cover for West Velley Fill SCRAPERI 1 7.57 $5,983 <br /> 022 Regrade Refuse Pile to Final Contours DOZER 3 7.41 $7,052 <br /> 023 Spread Overburden on East Refuse Pile SCRAPERI 1 12.91 $10,202 <br /> 026 Place Four Feet of Cover on II-West Refuse Pile SCRAPERI 1 23.68 $18,720 <br /> 030 Compact Steep Slope Areas and Coal Stockpile COMPACT 1 227.54 $35,040 <br /> Material <br /> 031 Compact All Ungraded Refuse Material COMPACT 1 5.50 $848 <br /> 032 Compact Refuse at II-West Refuse Pile COMPACT 1 5.93 $914 <br /> 034 Rip All Surface Facility Areas RIPPER 3 29.04 $30,173 <br /> 040 Rip and Regrade C-Seam Access Road DOZER 3 0.67 $703 <br /> 041 Regrade Lower Power Line Access Road EXCAVATE 1 41.01 $6,455 <br /> 042 Regrade Pond C Access Road DOZER 3 3.85 $3,663 <br /> 043 Regrade Light-Use Road to CBM-15 DOZER 3 0.20 $193 <br /> 044 Regrade Light-Use Roads from MR's and TR's DOZER 3 108.25 $103,013 <br /> 050 Finish Grade All Disturbed Areas GRADER 1 53.85 $8,012 <br />