My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-16_GENERAL DOCUMENTS - C1981037 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981037
>
2019-10-16_GENERAL DOCUMENTS - C1981037 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:43:36 AM
Creation date
10/16/2019 8:14:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
10/16/2019
Doc Name
Correspondence
From
DRMS
To
Dr Corley
Email Name
ZTT
JDM
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Pioneer Canon Phase 1 <br /> Project Close Out Report <br /> OSM Number 08198 <br /> 12th Construction Grant <br /> January, 1994 <br /> It PROJECT OVERVIEW <br /> The Pioneer Canon Phase 1 Project involved drilling and investigation of an active coal fire <br /> located in the South Field area of the Canon City Coal Field, Fremont County, Colorado. <br /> The fire is presently burning in the Pioneer Canon-AKA-Double Dick mine located in the <br /> SEI/4 Sec.24, T.20 S., R.70 W.(Sec attached maps for site location). <br /> The project included drilling exploratory holes to determine subsurface overburden and <br /> mine conditions, identify extent and direction of movement of the fire,and develop data and <br /> an understanding of the fire so that a containment or extinguishment approach could be <br /> designed for Phase 11. Temperature monitoring instruments were also installed to monitor <br /> fire behavior and evaluate future planned remediation efforts. The project was designed <br /> and developed by Bruce Stover, of the Colorado Division of Minerals and Geology. <br /> II LANDOWNER CONSENT <br /> (JULIE to provide) <br /> III II CONSTRUCTION <br /> Pioneer Canon Phase I RN-MINES-303 <br /> Advertisement for hid Dates: 04/08/93, 04/15/93 <br /> Pre-131'd Meeting Date: 04/21/93 <br /> Bid Opening Date: 05/05/93 <br /> Low Bid Amount: $539850.00 <br /> Number of Bids: 2 <br /> Notice of Award Hate: 05/07/93 <br /> Notice to Proceed Date: 06/14/93 <br /> Construction Start Date: 06/14/93 <br /> Construction Completion Date: 08/05/93 <br /> Final Settlement Ad Dates: 08/25/93, 08/26/93 <br /> Final Settlement Date: 09/07/93 <br /> Contractor: Golden Drilling Inc., Salida CO <br /> Subcontractors: None <br /> Final Cost: $32,871.68 <br /> Change Orders 1) 7/28/93 Changes to type of casing, additional cost of <br /> backfill due to uncooperative landowner. <br /> Added Features <br /> None <br />
The URL can be used to link to this page
Your browser does not support the video tag.