My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-16_GENERAL DOCUMENTS - C1981037 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981037
>
2019-10-16_GENERAL DOCUMENTS - C1981037 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:43:36 AM
Creation date
10/16/2019 8:14:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
10/16/2019
Doc Name
Correspondence
From
DRMS
To
Dr Corley
Email Name
ZTT
JDM
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> then went into a tirade of how upset and furious <br /> he has become over a series of other issues he is <br /> at loggerheads with the Coal Program over, and <br /> that he is planning on taking them to court. I <br /> explained that I had no knowledge nor interest in <br /> these unrelated issues, and asked what they had <br /> to do witb the present situation, and our mutual <br /> efforts to proceed with investigation and <br /> mitigation of the fire. He stated that, <br /> unfortunately, he needed to be able to use this <br /> alleged incident of not having his prior consent to <br /> use the baclill as a bargaining chip with the <br /> Coal Program... that they were always picking on <br /> him for every little silly thing, and that he was <br /> going to use this perceived incident as a way of <br /> giving the Division a dose of its own medicine. I <br /> expressed my disappointment in his intent to use <br /> such a minor misunderstanding between he and <br /> I as a point of conflict with others who were not <br /> involved, but he insisted that the Division as a <br /> whole, and unfortunately i was a pram of it, had <br /> pushed him too far, and felt it was necessary to <br /> use the incident as part of"his hand", in the forth <br /> coming law suit. At this point I asked him if he <br /> objected to the backfilling of the vents and holes, <br /> and he said no, that it needed to be done. I <br /> asked hinn if he understood-my motives in using <br /> the materials from a disturbed area adjacent to <br /> the job site, and which is to be reclaimed soon, <br /> and he said yes, that it was a logical approach, <br /> but I should have checked with Nina first I asked <br /> him if it would be OK to finish the job by paying <br /> for the materials as he had agreed with the <br /> Contractor, and he said no, that he would now <br /> prefer that all work be stopped until ';we sit down <br /> and resolve this issue with Mike Long and Steve <br /> Renner." He went on to suggest that Steve <br /> should probably call hint,as soon as possible, and <br /> that he was going to be in the office that morning <br /> consulting with his attorney,can the matter. <br /> July 26, 9:30arn- I contacted personnel at Energy Fuels by <br /> Telephone and asked therm to go up to the job <br /> site and have Sill call me as soon as possible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.