My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:25:02 AM
Creation date
10/9/2019 2:24:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 5 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number: AIRS ID Number: <br /> [Leave blank unless APCD has already assigned a permit r and AIRS ID] <br /> Section 4C- Drilling and Blasting <br /> Drilling Blasting <br /> Number of holes drilled(daily) NA Blast area(acres) NA <br /> Number of holes drilled(annual) NA Number of blasts(daily) NA <br /> Proposed controls for drilling Number of blasts(annual) NA <br /> ❑Water injection Type of blasting material NA <br /> ❑Bag collectors Blasting material used(daily) NA <br /> ❑Other(specify) Blasting material used(onnuoll NA <br /> Section 4D- Raw Material <br /> Removal Stockpile(s) <br /> Material removed daily(tons) 4,800 Maximum stored on site(tons) 10,000 <br /> Material removed annual(tons) 1,250,000 Proposed control for raw material stockpile <br /> Maximum drop height(Jeer) 6 ❑✓ Watering <br /> i <br /> Specific moisture content(°,) 0.3 ❑Chemical stabilizer <br /> Proposed controls for raw material removal ❑Compacting of piles <br /> ❑Moist material ❑Enclosures/choose one option from below) <br /> Q Water spray ❑Complete ❑Partial <br /> ❑Other tspecify) ❑Other(specify) <br /> Section 4E- Conveyors and Transfer Points(not assigned to process equipment) <br /> Include a map detailing the conveyor system layout within the site. <br /> Conveying Transfer Points <br /> Material conveyed daily(tons) Number of transfer <br /> NA points NA <br /> Material conveyed annual(tons) NA Proposed controls for transfer points <br /> Proposed controls for conveyors ❑Watering <br /> ❑Enclosures(choose one option from below) [:]Chemical stabilizer <br /> ❑Complete ❑Partial ❑Enclosures(choose one option from below) <br /> ❑Other(specify) ❑Complete ❑Partial <br /> ❑Other fspecify) <br /> CO LOA nDO <br /> Form APCD-222 - Mining Operations APEN - Revision 3/2019 4 1 - 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.