Laserfiche WebLink
Permit Number: AIRS ID Number: <br /> [Leave blank unless APCD has atready assigned a permit a and AIRS ID] <br /> Section 4F-Processing Equipment <br /> Will processing(i.e., crushing, screening, etc.)occur on site? (yes/no) -yes <br /> If you answered "No"above(i.e. no processing/manufacturing equipment will be located on site)check the box <br /> below and skip to page 6, Section 4G- Finished Product. <br /> ❑Check this box if no process equipment is located on site. <br /> List any additional emission sources and related controls(e.g.concrete batch plants,crushers/screens, engines, <br /> conveyors and transfer points associated with process equipment, asphalt plants, etc.). Additional APENs for any <br /> such equipment may be required. The following specialty APENs are available: Form APCD-224 Concrete Batch <br /> Plant APEN, Form APCD-221 Crusher/Screen APEN, Form APCD-233 Compression Ignition Engine APEN. If a specialty <br /> APEN is not appropriate for the additional equipment, use Form APCD-200 General APEN. <br /> Additionally,complete the section below regarding crushing and screening performed on site. <br /> Emission Source Control Equipment Description Permit Number <br /> (or equipment type) (if available) <br /> Feeder Breaker(Crusher) <br /> 236 Hp Generator <br /> Primary Crushing Screening/Classifying <br /> Maximum crushed per year(tons) 1,250,000 Maximum screened per year(tons) NA <br /> Design process rate(tons/hours 1,000 Design process rate(tons/hour) NA <br /> Duration of daily crushing(hours) 24 Duration of daily screening(hours) <br /> Secondary Crushing Secondary Screening/Classifying <br /> Maximum crushed per year(tons) NA Maximum screened per year(tons) NA <br /> Design process rate(tons/hourl NA Design process rate(tonsthour) NA <br /> Proposed control for crushing Proposed control for screening <br /> ❑Moist material ❑Moist material <br /> ❑Water spray ❑Water spray <br /> ❑Enclosures(choose one option from below) ❑Enclosures(choose one option from below) <br /> ❑Complete ❑Partial ❑Complete ❑Partial <br /> ❑Other(specify) ❑Other(specify) <br /> Note: Completion of this section does not relieve the applicant from the requirement to submit APEN forms for <br /> process equipment subject to APEN or permitting requirements. <br /> AIW COLORADO <br /> Form APCD-222 - Mining Operations APEN - Revision 3/2019 5 1 <br />