Laserfiche WebLink
Uinta Basin Sand,LLC <br /> Crushing and Screening Emissions Calculator <br /> )nstruetions-Fill in your information into the ttal-cclored boxes and refer to the yellow hrghl,gnted boss for your reportable calculated emssions. <br /> If you have multiple pieces of equipment,only use the calulator for one piece of equipment at a time to get accurate results for OPEN and Permitting <br /> requirements.For example,calculate the emissions from your crusher,clear out the calculator and then calculate emissions from the screen since the need for <br /> an APEN is based on the emissions from the single piece of equipment,There is on option for combo units <br /> If values appear as gray ond/ar crossed out,they are not above the reporting threshold and can be ignored. <br /> Type of equipment: Crusher APEN Required? YES <br /> Do you control PM t• i%sions with ware[%pray? as Permit Required? NO <br /> Do materials qo throuth secondary crushlm,?. No <br /> [Oltentronally,left Hank] Im, Total Emissions(tons/year) <br /> Do materials go Ilnnugh s.Yarsdmy--rung? No Uncontrolled Controlled <br /> ,mlentlonally left Monk] tons 7.37 7.57 <br /> 11-1 Amount of Material Processed: 1.250.000 Imx Ix•t Vein M,a 2.99 L99 <br /> Number oI hater.[Transfm Points: 2 u 4S u 45 <br /> TSP Emission Calculations <br /> Uncontrolled Emission Uncontrolled TSP Emission <br /> Controlled <br /> Emission Source Factor(Ib/ton) (ton/year) Control% TSP Emission <br /> (tan/year) <br /> CRUSHER HOPPER LOADING 0.0004 0.2462 0.00% 0.2462 <br /> PRIMARY CRUSHING 0.0054 3.3750 0.0D% 3.1750 <br /> .t Rif low. a.trl'.J J 00(1ti O Or_ 0.0000 <br /> SECONDARY CRUSHING 0.0054 0.0000 0.00% 0.0000 <br /> I, f1I10.• u.W'.0 •ursr0 ;ts43S, 0.0000 <br /> I(a+vEYORS AND TRANSFER POINTS 0.0030 f.7500 0.. 3.2500 <br /> Total TSP: 7.37 0.00%1 7.37 <br /> PM„Emission Calculation, <br /> Uncontrolled Emission Uncontrolled PM,Emission Controlled <br /> Emission Source Control% PM„Emission <br /> Factor(Ib/ton) (ton/year) <br /> (ton/year) <br /> CRUSHER HOPPER LOADING 0.0002 0.1165 0,00% 0.1165 <br /> PRIMARY CRUSHING 0.0024 1.5000 0.00% 1.5000 <br /> a RI FAIN( 0.(XW 0.(%)O0 0.00% 0.0000 <br /> SECONDARY CRUSHING 0.0024 0.0000 O.OD% 0.0000 <br /> RFSCRFF.t4w, O.Ow 0.00OQ 0.00% 0.0000 <br /> CONVEYORS AND TRANSFER POINTS 0.0011 1.3750 0.00% 1.)750 <br /> nta 2.v9 0.00% 2.99 <br /> PM"Emission Calculations <br /> Uncontrolled Emission Uncontrolled PM,s Emission M,EmikO <br /> Emission Source Control% P Emission <br /> Factor(Ib/wn) (ron/year) <br /> Icon/year[ <br /> CRUSHER HOPPER LOADING-_-- - 0.0000 - --- _ ---0.0175 0.00% 0.0175 <br /> PRIMARY CRUSHING 0.0004 0.2250 O.W% 0.2250 <br /> SCRI FNIN(: 0.ODt1 0.0000 0.00% 0.0000 <br /> SECONDARY CRUSHING 0.0004 0.0000 0.00% 0.0000 <br /> RFSCRFFNINt. O.W1I O.OWD 0.00% 0.0ow <br /> CONVEYORS AND TRANSFER POINTS O.C1002 0.2.3 0.00% 0.2063 <br /> eta 0.451 0.00111110.45 <br /> PTE Caks.USS_Mine Site•V2.xisx 9/3/2019 <br />