My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054 (48)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054 (48)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:09:01 AM
Creation date
10/9/2019 2:18:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 2 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number: AIRS ID Number: <br /> Section 4 - Processing/Manufacturing Information It Material Use <br /> From what year is the actual annual amount' NA <br /> Design Process Actual Annual Requested Annual <br /> Description Rate Amount Permit Limit6 <br /> (tonslhour) (tons) (tons) <br /> Material Sandstone 1000 NA I{ 1,250,000 <br /> Throughput: - — — -- -- I <br /> i LLL <br /> 6 Requested values will become permit limitations.Requested limit(sl should consider future process growth. <br /> Section 5 - Geographical Information <br /> Geographical Coordinates <br /> (Latitude/Longitude or UTM) <br /> 40.273063/-108.680683 <br /> Attach a topographic site map showing location. <br /> Section 6 - Criteria Pollutant Emissions Information <br /> Attach all emissions calculations and emission factor documentation to this APEN form. The APCD website has a <br /> Crushing and Screening Emissions Calculator available to assist with emissions calculations. <br /> Is this equipment equipped with water spray bars for emission control? ❑Yes ❑✓ No <br /> Use the following table to report the criteria pollutant emissions from source: <br /> (Use the data reported in Section 4 to calculate these emissions,.) <br /> From what year are the actual annual emissions' NA <br /> Uncontrolled Emission Factor Actual Annual Emissions Requested Annual Permit <br /> Pollutant Emission Source Emission Limits) <br /> Factor (Aa-42 Mfg Uncontrolled Controlledr Uncontrolled Controlled <br /> (specify units) etc.) (tonslyear) (tonslyear) j (tonslyear) (tonslyear) <br /> TSP(PM) 0054 Ib/ton c as E-ss rrc d:_. 7.37 7.37 <br /> PM10 .00241b/ton csSE-ss—rX, 2.99 2.99 <br /> PM:.s .004 lb/ton c SS E-,;,,,C'Ic a zr .45 .45 1 <br /> Other: <br /> 6 Requested values will become permit limitations. Requested timit(sl should consider future process growth. <br /> 7 Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating.leave blank. <br />
The URL can be used to link to this page
Your browser does not support the video tag.