My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054 (48)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054 (48)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:09:01 AM
Creation date
10/9/2019 2:18:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 2 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number: AIRS ID Number: <br /> Section 2 - Requested Action <br /> Q NEW permit OR newly-reported emission source io ecx one below) <br /> Q STATIONARY source ❑ PORTABLE source3 <br /> -OR- <br /> ❑ MODIFICATION to existing permit(check each box beio;v thct applies; <br /> ❑ El Change equipment Change status: Add point to existing <br /> ❑ portable/stationary permit <br /> ❑ Change processing limit ❑ Transfer of ownership' ❑ Change company name' <br /> ❑ Other(describe below) <br /> -OR- <br /> ❑ APEN submittal for update only(Blank APENs will not be accepted) <br /> -ADDITIONAL PERMIT Ac-iIONS- <br /> [] APEN submittal for permit-exempt/grandfathered source <br /> ❑ Voluntary permit for otherwise permit-exempt source- <br /> Additional Info Et Notes: <br /> Note that a permit-exempt portable source may be requirea to obtain a permit based on the facility-wide emissions totals of <br /> the operating location. <br /> '(For transfer of ownership,a completed Transfer of Ownership Certification Form (Form APCD-104(must be submitted. <br /> 9 For company name change.a completed Company Name Change Certification Form(Form APCD-106)must be submitted. <br /> Section 3 - Genera! Information <br /> 0 Crusher Only ❑ Screen Only ❑ Crusher-Screen Combo Unit <br /> If"Crusher-Screen Combo Unit"is selected, the crusher and screen must be bolted together and must always travel as one unit. if <br /> this is not true,you must fill out a separate APEN for each piece of equipment. <br /> ,Manufacturer: TBD Model No.: TBD Serial No.: TBD <br /> Company equipment Identification No. (optional): Feeder Breaker <br /> For existing sources, operation began on: NA <br /> For new or reconstructed sources, the projected start-up date is: TBD <br /> ❑Check this box if operating hours are 8,760 hours per year; if fewer, fill out the fields below: <br /> Norma(Hours of Source <br /> Operation: �t 2,i hoursiday 5 days/week 52 weeks/year <br /> Operation: <br /> Seasonal use Dec- Mar- June- Sept- <br /> percentage: Feb: 100 % May: 1 OO % Aug: 1 00% Nov: 1 OQ % <br /> How many material transfer points are included on this equipment? 2 <br /> A transfer point is defined as any location where material moves from a conveyor to another conveyor.screen,or pile. It <br /> does not include the transfer of material into a hopper. <br />
The URL can be used to link to this page
Your browser does not support the video tag.