My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054 (48)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054 (48)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:09:01 AM
Creation date
10/9/2019 2:18:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 2 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FPC_Sku llCreek_Tru ck-Shove I_Topsoi I <br /> Cycle Times <br /> Hauler Cycle Time <br /> 5 769C <br /> Load with Exchange(min) 1.25 <br /> Haul(min) 1.51 <br /> Dump and Maneuver(min) 1.2 <br /> Return(min) 1.57 <br /> Potential Cycle Time(min) 5.53 <br /> Wait on Slow Hauler(min) 0 <br /> Wait to Load(min) 0.72 <br /> Additional Bunching(min) 0.68 <br /> Wait to Dump(min) 0 <br /> TMPH Wait(min) <br /> Total Cycle Time(min) 6.93 <br /> Bunching Avg <br /> Haul Start mph 0 <br /> Haul End mph 0 <br /> Return Start mph 0 <br /> Return End mph 0 <br /> Loader Cycle Time <br /> 5 769C <br /> Loader Model 385C LME <br /> Loader Quantity 1 <br /> Bucket Capacity(CY) 7.25 <br /> Loader Fill Factor(%) 100 <br /> Loose Density(Lbs/LCY) 1,601 <br /> Tons per Pass 5.8 <br /> System Passes per Hauler 3 <br /> Hauler Payload(Tons) 17.41 <br /> %of Max GVW 87.58 <br /> Hauler Volume(LCY) 21.75 <br /> %of Body Fill 70 <br /> Loader Cycle Time(min) 0.25 <br /> First Bucket Dump(min) 0.05 <br /> Hauler Exchange Time(min) 0.7 <br /> Fleet Production <br /> Fleet Estimates <br /> Operating Schedule <br /> Operator Efficiency 90% <br /> Schedule Period Shift <br /> Scheduled Hours 10.5 <br /> Fleet Estimates <br /> Fleet Availability 87.87% <br /> Production per Sched Fir 516.36 BCY <br /> Total Production 500,000 BCY <br /> Sched Hrs Required 968.33 <br /> Total Cost($) 678,986 <br /> Cost per BCY($) 1.358 <br /> Production per Shift 5,422 BCY <br /> Shifts Required 92.22 <br /> Theoretical Production <br /> Quantity Model BCY per Hour Cycles per Hour <br /> 1 1 385C LIVE 724 <br /> 2 5 769C 818 10.8 <br /> Actual Production <br /> Quantity Model Cycles per Hour Payload in Tons Tons per Hour <br /> 1 5 769C 8.66 17.41 753.82 <br /> Fleet Tons per Operating Hour 753.82 <br /> x 90.00%Operator Efficiency= 678.44 <br /> x 87.87%Fleet Availability= 596.13 <br /> Cost <br /> City Model Machine Code Hourly Cost Each Unit Operating Hours Total$ $per BCY <br /> Loaders 1 385C LIVE 124.78 871 108,745 0.217 <br /> Haulers: 5 769C C202 93.35 4,254 397,145 0.794 <br /> Totals 5 4,254 397,145 0.794 <br /> Support 1 5,000 Gal.Water Truck 66.58 638 42,487 0.085 <br /> 1 14 Grader 82.84 425 35,242 0.07 <br /> 1 D7 Dozer 88.21 766 67,548 0.135 <br /> Totals 3 1,829 145,278 0.291 <br /> Fleet Totals 91 6,95SI 651,167 1.302 <br />
The URL can be used to link to this page
Your browser does not support the video tag.