My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054 (48)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054 (48)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:09:01 AM
Creation date
10/9/2019 2:18:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 2 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FPC SkullCreek Truck-Shovel Backfill <br /> Cycle Times <br /> Hauler Cycle Time <br /> 6 769C <br /> Load with Exchange(min) 1.25 <br /> Haul(min) 1.81 <br /> Dump and Maneuver(min) 1.2 <br /> Return(min) 1.62 <br /> Potential Cycle Time(min) 5.88 <br /> Wait on Slow Hauler(min) 0 <br /> Wait to Load(min) 1.62 <br /> Additional Bunching(min) 0.44 <br /> Wait to Dump(min) 0 <br /> TMPH Wait(min) <br /> Total Cycle Time(min) 7.94 <br /> Bunching Avg <br /> Haul Start mph 0 <br /> Haul End mph 0 <br /> Return Start mph 0 <br /> Return End mph 0 <br /> Loader Cycle Time <br /> 6 769C <br /> Loader Model 385C LME <br /> Loader Quantity 1 <br /> Bucket Capacity(CY) 7.25 <br /> Loader Fill Factor(%) 100 <br /> Loose Density(Lbs/LCY) 2,498 <br /> Tons per Pass 9.06 <br /> System Passes per Hauler 3 <br /> Hauler Payload(Tons) 27.17 <br /> %of Max GVW 103.52 <br /> Hauler Volume(LCY) 21.75 <br /> %of Body Fill 70 <br /> Loader Cycle Time(min) 0.25 <br /> First Bucket Dump(min) 0.05 <br /> Hauler Exchange Time(min) 0.7 <br /> Fleet Production <br /> Fleet Estimates <br /> Operating Schedule <br /> Operator Efficiency 90% <br /> Schedule Period Shift <br /> Scheduled Hours 10.5 <br /> Fleet Estimates <br /> Fleet Availability 87.49% <br /> Production per Sched Hr 693.54 BCY <br /> Total Production 1,540,000 BCY <br /> Sched Hrs Required 2,220.49 <br /> Total Cost($) 1,786,945 <br /> Cost per BCY($) 1.16 <br /> Production per Shift 7,282 BCY <br /> Shifts Required 211.48 <br /> Theoretical Production <br /> Quantity Model BCY per Hour Cycles per Hour <br /> 1 1 385C LME 932 <br /> 2 6 769C 1,188 10.2 <br /> Actual Production <br /> Quantity Model Cycles per Hour Payload in Tons Tons per Hour <br /> 1 5 769C 7.56 27.17 1,026.87 <br /> Fleet Tons per Operating Hour 1,026.87 <br /> x 90.00%Operator Efficiency= 924.18 <br /> x 87.49%Fleet Availability= 808.55 <br /> Cost <br /> Qty Model Machine Code Hourly Cost Each Unit Operating Hours Total$ $per BCY <br /> Loaders 1 385C LME 124.78 1,998 249,366 0.162 <br /> Haulers: 6 769C C202 93.51 11,656 1,089,947 0.708 <br /> Totals 6 11,656 1,089,947 0.708 <br /> Support 1 5,000 Gal.Water Truck 66.58 1,457 97,008 0.063 <br /> 114 Grader 82.84 971 80,466 O.OS2 <br /> 1 010 Dozer 132.42 1,457 192,937 0.125 <br /> Totals 3 3,885 370,411 0.241 <br /> Fleet Totals 30 17,540 1,709,723 1.11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.