Laserfiche WebLink
Table L-1. Skull Creek Point of Maximum Reclamation Liability Determination <br /> Phase 1 Phase 2 Phase 3 <br /> Phase 1 Bond Phase 2 Bond Phase 3 Bond Total Bond <br /> Included Pits/Areas Surface Area Surface Area Surface Area <br /> Stage of Reclamation Amount Amount Amount Amount <br /> g (acres) (acres) (acres) <br /> *All amounts escalated to 2020 <br /> Point of Maximum Reclamation Liability <br /> Phase 1, 2&3 E_1 $ 2,306,165 4.7 $ 16,698 4.7 $ 5,985 4.7 $ 2,328,849 <br /> Phase 2&3 E_2 - $ 19,880 5.6 $ 7,126 5.6 $ 27,007 <br /> Phase 2&3 E_3 $ 21,990 6.2 $ 7,882 6.2 $ 29,872 <br /> Phase 2&3 E_4 $ 27,246 7.6 $ 9,766 7.6 $ 37,013 <br /> Phase 2&3 E_5 - $ 31,358 8.8 $ 11,240 8.8 $ 42,598 <br /> Phase 2&3 PRODUCT - $ 26,138 7.3 $ 9,369 7.3 $ 35,507 <br /> Phase 2&3 SPOIL&REJECTS - $ 67,937 19.0 $ 24,352 19.0 $ 92,289 <br /> Phase 2&3 ROAD&SOIL - $ 59,713 16.7 $ 21,404 16.7 $ 81,117 <br /> Total $ 2,306,165 4.7 $ 270,960 75.8 $ 97,126 75.8 $ 2,674,251 <br />