My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054 (48)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054 (48)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:09:01 AM
Creation date
10/9/2019 2:18:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 2 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L Skull Creek Sand Project <br /> All material volume and surface area calculations were performed utilizing Carlson Civil and Mining <br /> software. <br /> Cost data sources include: <br /> • RSMeans Heavy Cost Construction 2018 <br /> • RSMeans Construction Cost Data 2018 <br /> • CostMine Cost Guide 2017 (latest version available) <br /> • CostMine Mine and Mill Equipment Cost Data, 2017 (latest version available) <br /> These sources are applied where appropriate in each of the cost estimates. Each line item in the <br /> estimate lists specifies which source is utilized for cost data. <br /> Cost Estimates <br /> The following is a brief summary of the information and methods used to calculate the costs for each <br /> category.The overall cost estimates below include total escalated costs applicable for all three phases of <br /> reclamation (where appropriate): <br /> Point of Maximum Reclamation Liability Determination <br /> This section details the polygons, phases and facilities included in the determination of the point in time <br /> where the permit area faces a maximum reclamation liability. This estimate is directly based on the <br /> sequence and mining and reclamation plans described in Chapter 5 of this MRP.The maximum liability <br /> amount is $2,674,251. <br /> Bond Polygon Cost Estimates <br /> This section tabulates the direct, indirect, and escalated reclamation costs for each polygon shown on <br /> Map E-2. These costs are also grouped by phase. The area totals shown at the bottom of these sheets <br /> are for illustrative purposes only and do not reflect actual liability. Instead,total liability is a function of <br /> the point of maximum liability discussed above. <br /> Production Model and Cost Assumptions <br /> Caterpillar's Fleet Production and Cost analysis software was utilized to establish a baseline cost model <br /> with inputs from the appropriate cost guides.This model provided unit costs on a $/BCY and $/LCY <br /> basis. <br /> The following documentation provides the details for each section of this bond estimate <br /> 2 <br /> 10/3/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.