Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#05A Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Regrade Well Pads <br /> Site: Nahcotite Project Permit Action: TR-44 Permit/Job#: M1983194 <br /> PROJECT IDENTIFICATION <br /> Task#: 05A State: Colorado Abbreviation: None <br /> Date: 10/1/2019 County: Rio Blanco Filename: M194-04a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EOUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Owner hip Cost/Hour: $103.86 NA <br /> Operating Cost/Hour: $82.26 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Rippt-r op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.24 NA <br /> Total unit Cost/Hour: $227.36 <br /> Total Fleet Cost/Hour: $454.72 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 148,427 <br /> Swell factor: 1.115 <br /> Loose volume: 165,496 LCY <br /> Source of estimated volume: 46 ac of pads grade 24"depth <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 75 feet <br /> Unadjusted hourly production: 1,017.1 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: 0% <br /> Average site altitude: 6,600 feet <br /> Material weight: 2,1001bs/LCY <br /> Weight description: Earth-Loam <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN. <br /> Visibility: 1.000 (AVG.) <br />