Laserfiche WebLink
Borehole Worksheet Cont'd Task#TTT Page 5 of 5 <br /> in. (labor,equip, <br /> materials) <br /> 16H-IR-E Bridge PVC plug-8 in. 8.9 1 1.00 EA $80.77 $80.77 <br /> Plug diameter borehole <br /> 17H-IR-E Portland cement grout-8 8.9 2138 2,138.00 LF $6.29 $13,452.30 <br /> in. (labor,equip, <br /> materials) <br /> 17H-IR-E Bridge PVC plug-8 in. 8.9 1 1.00 EA $80.77 $80.77 <br /> Plug diameter borehole <br /> Job Hours: 610.00 Total Cost: $600,185.00 <br /> CIRCES Cost Estimating Software <br />